IS HI-POT TEST DONE ON A TRANSFORMER - YES OR NO?
WHY?
Answers were Sorted based on User's Feedback
Answer / gunasekaran
yes we have to check the insulation helthyness and leakage
current of the insulation.at the time of hipot suppose ur
doing hipot for HV LV should be shortedand earthed that
time we can get healthyness of insulation of the transformer
Is This Answer Correct ? | 11 Yes | 4 No |
Answer / ars326
Most of the transformer companies and testing centres in
india and abroad does not perform this test often,only
during extreme circumstances because this test causes stress
on insulation system due to high voltage which may lead to
windings burn out and transformer failure.
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / erick
Yes. Hi-Pot is short for High Potential (Voltage) which
can be deadly if it leaks from the transformer. The test
itself is to see if the insulation of the transformer is
adequate considering the voltage involved. High voltage
transformers such as those little ones in Switch Mode power
supplies also are tested. Google HiPot and see all the
equipment available for this type testing
Is This Answer Correct ? | 3 Yes | 0 No |
what is the difference between star and delta connection?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
if we going for high voltage usages what are the considering factors, why those factors are effected.... please give me an answer related motor factors like wnidnig, frame, temp etc
single phase 230v three phase voltage 415volt why we aren't used line voltage 690v?
what happen if we give 220 volts dc supply to d bulb r tube light?
How to calculate the Meter constant for the given Meter (by using any formula)
capacitor applied voltage is 1100VDC & capacitance value is 82uF how to calculate current of capacitor.
Maximum efficiency occurs in electrical machines is at i)Full load,ii)50% of full load,iii)Near full load,iv)None of these
how to test the turn ratio of 3 phase transformer using volt meter shoe the curcit diagram.
What is the correct procedure to shutdown VCB in 11kv substation.safety and work procedure
explain 100 percent and 95 percent earth faults
what is harmonics?