where we use 1 phase & 3 phase supply ?what is major
advantage using 3 phase over than single phase ?
Answers were Sorted based on User's Feedback
Answer / subhamoy chandra
The major advantage of using 3ph over single phase is that
we can have more voltage and more power.
1ph is basically used in small rated machines.
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / mahavir jagdev
1. lesser current (hence smaller capacity wiring) for same load
2. balance load on the bus bar
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / b. salazar
Three phase requires less current than single phase. The more power, the more likely you will need to use three phase. The reason is the physics of the source of electricity. Basically, a single phase circuit experiences 0V for a very tiny amount of time in each half cycle. Building up from 0V takes energy and thus requires more current. Three phase phases individually experience a 0V period, but the other phases do not hit 0V at the same time. This means that there is no build up of power in every half cycle. This need for increased current is negligible for very small machines. The larges sing phase machine in the NEC is 10 HP which requires 50A at 230V, but 10 HP at 230V three phase only requires 28A.
| Is This Answer Correct ? | 0 Yes | 0 No |
When star connection of motor is use?
why ac current do not save
Squirrel cage induction motor has constant A slip B stator current C rotor resistance D speed at all load
what is grounding & what is the value of groumding rod 2.5m?
what is the avr
6 Answers ArcelorMittal, Heidelberge Cement,
How one may guess the direction from which the distribution line is incoming if there is no pole plate on poles?
what are the different types and applications of compressors?
My meter CT is 200/5amps Then my electrical meter MF=???please suggest
when a 500kva-400hz single phase transformer operated on a 100hz supply then what will be kva required
How to calculate cable size by using load.?? Any formula...
i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected
0 Answers TNEB Tamil Nadu Electricity Board,
How to calculate battery back up time for a 400 AH battery bank installed in telecom shelter for a load of 20 Amps and time taken to fully charge this battery bank?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)