Answer / sanjay kumar
Earth leakage circuit breaker(ELCB) trips during leakage of
current from ckt. to earth.
Residual current circuit breaker(RCCB) will trip if
algebric sum of current is not be zero.
| Is This Answer Correct ? | 39 Yes | 4 No |
Answer / kulvinder singh, nit kurukshet
ELCB is used tirip the breaker when there is any leakage
of live current to the earth point.
RCCB-it detects the electric current is not balanced
between the energised conductor and return neutral
conductor.Such an imbalance is also caused if any human
body comes in contact with live conductor.
| Is This Answer Correct ? | 17 Yes | 0 No |
Answer / anoop k.liz
ELCB- ELCB will be tripped on a leakage of current from phase to earth.
RCCB- MCB+ELCB= RCCB. It will tripped on both fault current or high current and earth leakage current.
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / sandy
ELCB OPERATORS WHEN THERE IS LEAKAGE FROM PHASE TO EARTH &
RCCB OPERATORS WHEN THERE IS LEAKAGE BETWEEN TWO PHASES.
| Is This Answer Correct ? | 15 Yes | 17 No |
Answer / pavi
Elcb is earth leakege circuite breaker rccb is earth leakage circuite breaker
| Is This Answer Correct ? | 0 Yes | 3 No |
How to check AC & DC Choke
what mean by machin
what is transformer
63 Answers ABB, Advance Power Controls, CERC, Electrical, Electrical Supervisor Competency Certificate, ETA, IBM, Jindal,
what will happen if the frequency supplied is more than the frequency of the instrument...?
What is basic impulse insulation level? And how it is calculated for sub- station?
How much current does a motor take in no load condition?
Can i use to 3 phase 4 wire energy meter inplace of 3 phase 3 wire energy meter ?
Why tripping not occur when the transmission lines (11KV & above) breaks? Doesn't we provide earthfault protection for it?
Control wiring of a dol starter for forward and backward
What is the deffirant between EARTH, GROUND AND NUTRAL
How generator NPS(NEGATIVE PHASE SEQUENCE TEST)TEST WAS DONE? PROCEDURE WITH DETAILS?
2 t/f operating in parallel will share the load according 2 their- a)leakage reactance,b)pu impedence,c)efficiency,d) rating.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)