is petroleum a mixture of hydrocarbon?
Answers were Sorted based on User's Feedback
Answer / vinothrajan
yes. petroleum is the mixture of hydrocarbon
Is This Answer Correct ? | 32 Yes | 0 No |
Answer / tanya
yes petroleum is a mixture of hydrocarbons.hydrocarbons are hydrogen and carbon atoms.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / srinivas tulishetti
Yes. Petroleum is the mixture of hydrocarbon.
Crude petroleum is mixture of paraffins, naphthalenes,
aromatics and asphalts, but not of olefins.
Is This Answer Correct ? | 3 Yes | 4 No |
Hi, Please give me chemical engineering paper for IOCL exam for entire written exam, GD and personel interview model questions to my email id. (chemistnathan@rediffmail.com) Rgds, Ragu
What are the reasons of removal of particles from effluent gas?
In gas and water who's density is greater and why?
Question 56 - The kinetic behavior of an enzyme could be described using Michalis - Menten equation : Vo = Vmax [S] / (Km + [S]). Derive this equation from [ES] = [E]total [S] / (Km + [S]), Vmax = Kcat [E]total, Vo = Kcat [ES].
Explain can large temperature differences in vaporizers cause operational problems?
Question 57 – There are 2 simultaneous equations : (A1) x + (B1) y = D1 and (A2) x + (B2) y = D2. (a) By using Excel program, find the values of x and y when A1 = 80, A2 = 150, B1 = 52, B2 = 100, D1 = 3.5 and D2 = 2.3. (b) Write the expression of Excel in the form of =MMULT(MINVERSE(W:X),Y:Z) in order to get the values of x and y. W, X, Y and Z may be A1, A2, B1, B2, D1 and D2.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.16 : An engineer would like to invest his money in a home, business and bond. The implicit interest payment frequency is monthly for home loans, quarterly for business loans; semi annually for bonds. A generalized mathematical formula to calculate I = interest rate equivalence is I = (1 + i / N) ^ N - 1 where i = annual interest rate, N = number of payment per year. (a) Calculate the value of N for : (i) home loans; (ii) business loans; (iii) bonds. (b) For i = 0.08, find the value of I for : (i) home loans; (ii) business loans; (iii) bonds.
HOW WOULD YOU CALIBRATE A ROTAMETER
hi i am chemical engg. 4 year student i am not placed till year what will i do for my batter futere
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.14 : For a formula of y = [ 1 - 1 / (1 + r) ^ n ] / r, let y = present value, r = interest rate / year, n = number of years to future value of 1 : (a) Find a simple mathematical relationship of y as a function of r when n = 1 million years. (b) What is the present value of $10000, if the annual discount rate is 10 %, forever?
Question 64 – According to a heuristic of chemical engineering plant design, assume a pressure difference dP = 4 psi for each 10-ft rise in elevation. A pump is needed to pump liquid from a storage tank at a lower elevation to a heating tank at a higher elevation with the elevation difference of 60 ft. (a) Find the pressure loss due to such elevation. (b) If the required minimum inlet pressure to the heating tank is 9 psi, with 1 control valve is installed between pump and heating tank, what is the dP minimum required for the control valve and the entrance to the heating tank when the heuristic mentions that at least 10 psi is required for the control valve? (c) The pressure at the inlet of the pump is 8 psi and the flowrate of the liquid produces pressure head of 50 psi. What is the total pressure produced by the pump? (d) Assume a pipeline dP of 2 psi / 100 ft for liquid flow in a pipe according to heuristic, what is the approximate maximum length of the pipe in ft that can be installed between the pump and the heating tank?
What are some factors to consider when trying choosing between a dry screw compressor and an oil-flooded screw compressor?