Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


any calculation method for decide cable size for current?



any calculation method for decide cable size for current?..

Answer / gopal

i=v/R and R=rho.L/A . by analysing these fourmulas we find the size . here i is electric current in the conductor to flow or load current to flow . v is the voltage across the conductor , R is the resistance of the conductor . L is the length of the conductor ,rho is a constant of a material called specific resistance here the the material is the material of the conductor , A is the area of cross section of the conductor .

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why single phase induction motors are not self starting ?

0 Answers  


How to Calculate the current drain in the battery (1.4V) for the 2mins time period?

7 Answers  


can we use inductor for passing or blocking of AC or DC?

3 Answers   Moser Baer, NTPC,


can any tell me how to do wiring connection in L&T 3ph 4wire E301 CT operated energy meter, what is P1,P2,P3,P0. M1,M2,M3, L1,L2,L3.

2 Answers   Bhartiya International,


Do I need a special Transformer to put 240 VAC 3 phase into it and and get 480 VAC 3 phase out of it to run a machine? Or, do I just use an ordinary step down transformer and step up the voltage? Thanks

2 Answers  


What is the main use of rotary phase converter ?

0 Answers  


IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace.

1 Answers   Jindal,


My self munna.I had completed diploma from mechanical can I join facility and maintanance companys

1 Answers  


What is the unit audit? if our Max demand is something and we found much more unit then how to improve our max demand?

0 Answers   SRM,


how many safety really of DG sets.

0 Answers   MBD, Nerolac,


How to calculate electrical Induction motor heating and cooling time constant,11KV,2850,12P,SCIM

2 Answers   Bhel, Regal Beloit,


induction 3 phase motor terminal connection

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)