A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8A

Answers were Sorted based on User's Feedback



A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8..

Answer / nivesh sharma

120 A

Is This Answer Correct ?    14 Yes 9 No

A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8..

Answer / dewan fazal

2 A

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

Why used in netural grounding transformer for netural side

2 Answers  


two bulbs of 100w and 40w respectively connected in paralel across a 230v supply.which bulb will glow bright and why?

4 Answers  


what is the difference between LATCH and FLIP FLOP

4 Answers   Wipro,


Is there any guideline say about display of earthing value near to earth pit

0 Answers  


why we use 50 hz frequency in india .. why not 60 hz 

3 Answers  






In scott connected transformer number of turns in the primary winding of teaser transformer is % of number of primary turns of main transformer A 86.6 B 57.7 C 14.4 D 33.3

1 Answers  


why two contacts(in series) are using in closing circuit

3 Answers  


what is active power and rective power and power factor

1 Answers  


What is the harm if we install primary side 11 KV VCB at a distance of one Km from the 11/3.3KV 12.5 MVA transformer through 11 KV cable.

4 Answers  


Dear friends, i would like to know that what is the exact function of 'exciter winding' & 'aux winding' in Alternator?

0 Answers   NTPC,


An electric bulb giving light but at the time of lighting which one it takes? voltage or current

6 Answers  


on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf  has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure? 

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)