Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8A

Answers were Sorted based on User's Feedback



A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8..

Answer / nivesh sharma

120 A

Is This Answer Correct ?    14 Yes 9 No

A charge of 240 C is transferred in 2 minutes. The current flowing is:(a) 480A(b) 120A(c) 2A(d) 8..

Answer / dewan fazal

2 A

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

wha tis the ac motor used for traction system

4 Answers  


when a pure dc signal is sent through a moving iron meter, what will it read?? dc or rms?? when a variable dc signal is sent through a moving iron meter, what will it read?? dc or rms??

1 Answers   GATE,


Explain Creepage Distance of Insulator

0 Answers   ABB,


The height to which the liquid in a tank to be maintained for a certain constant velocity?

0 Answers  


What is the function of a capacitor in a ceiling fan?

2 Answers  


Slip at maximum torque depends on A rotor resistance and reactance B stator reactance C load current D stator resistance

1 Answers  


what is earthing/

3 Answers   B.Tech, CPCL, Mobiserv,


What is the work of ACCP in LT panel?

5 Answers   Juniper Networks,


where is the need for short circuit test for 3 see is required and why? can you explain in brief with application

0 Answers  


What are the Return ( Monthly / quarterly/ Annual submitted to Electical Inspector for an establishment (Factory in Maharashtra-- Small scale category having seperate HT line of 22KV ) as per Maharashtra Electricity Act

0 Answers  


Can u tell me the name of books of transformer testing?

6 Answers  


whatis the test procedure for lightning arrester which was installed one year back. i want check it whether it is working or not.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)