how many cement bag in 1m*m*m
Answers were Sorted based on User's Feedback
Answer / nagori salim
Vol of 1 bag of cement = 50/1440
= 0.0347 cumec
For 1 cumec = 1/0.0347
= 28.818
= 29 bags
| Is This Answer Correct ? | 17 Yes | 2 No |
Answer / saravanakumar.a
cement voloume is for 1440kg/m3
1 bag 50 kg
=1440/50
=28.8 bags/cum
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / michael collins
Are you asking how many bags of cement in 1m3 of concrete or how many bags in one m3 of dry cement powder (i.e: a little more than a palette of portland).
concrete: roughly eight bags
drycement powder: roughly 30 bags.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / yash tamakuwala
for m-20 mix concrete approx.. 8 bags needed
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / ahmed
Daer
the amount of cement in m3 according to ACI code with
mixture ratio 1:2:4 is 300 kg
and the amount of sand is 0.42 m3
and the amount of cource aggregate(gravel) is 0.84
regards
civil engineer
Ahmed Sami
IRAQ
| Is This Answer Correct ? | 9 Yes | 5 No |
Answer / mahammad dawood mandokhail
the volume of 1 cum cement bag is 0.034
so
1/0.034=29.41
or
one bag of cement is 50kg
so
50/0.034=1470
now
1470/50=29.41 that`s approximately equal to 30bags of cement.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / a.k. max
if the portland cement density is 1505kg/cu.m. then in 1
cu.m. we will have 1505kg of cement. as a result in 1cu.m.
we have 1505/50=30.1 bags
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / m.shilpa
Density of cement is 1440kg/cum.
weight of 1 cement bag is 50kgs.
By dividing density by weigt of bag we can get number of
bags per cum.
Thatis 1440/50 = 28.8 bags.
we can do it in other form to.
1bag is equal to 35 litres of water
therefore 1cum =1000litres
total no of bags = 1000/35 =28.8 bags
| Is This Answer Correct ? | 3 Yes | 0 No |
I've 47'-6" x 89'-6" of flat RCC Slab 12mm dia 8" c/c. Please calculate the total weight of slab, weight of steel, and how much dead load it contains. Thanks
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
how to calculate the steel for rcc slab 1100 Square feet
what is the stripping time of beam column & slab?
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
What is the proportion of M 45 grade of concrete
Give open excavation details of Building.
Whether dry volume or wet volume of concrete more but why?
If we know the N - Value of soil and required bearing capacity how do we know what diameter and length of pile to be casted? How can we check whether the dia. and lenght of pile we have selected are most economical onse?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
if the slab is 2 way then,where we will put lapping upper and lower side?means near to beam or center and near to center?
What are the techniques to measure road difference?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)