Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many cement bag in 1m*m*m

Answers were Sorted based on User's Feedback



how many cement bag in 1m*m*m..

Answer / nagori salim

Vol of 1 bag of cement = 50/1440
= 0.0347 cumec

For 1 cumec = 1/0.0347
= 28.818
= 29 bags

Is This Answer Correct ?    17 Yes 2 No

how many cement bag in 1m*m*m..

Answer / kannan

28.8 bags

Is This Answer Correct ?    13 Yes 0 No

how many cement bag in 1m*m*m..

Answer / suresh ch

1 cum Cement = 1440 Kgs so 1440/50 = 28.8 bags

Is This Answer Correct ?    11 Yes 0 No

how many cement bag in 1m*m*m..

Answer / saravanakumar.a

cement voloume is for 1440kg/m3

1 bag 50 kg

=1440/50
=28.8 bags/cum

Is This Answer Correct ?    10 Yes 0 No

how many cement bag in 1m*m*m..

Answer / michael collins

Are you asking how many bags of cement in 1m3 of concrete or how many bags in one m3 of dry cement powder (i.e: a little more than a palette of portland).

concrete: roughly eight bags
drycement powder: roughly 30 bags.

Is This Answer Correct ?    5 Yes 0 No

how many cement bag in 1m*m*m..

Answer / yash tamakuwala

for m-20 mix concrete approx.. 8 bags needed

Is This Answer Correct ?    5 Yes 0 No

how many cement bag in 1m*m*m..

Answer / ahmed

Daer

the amount of cement in m3 according to ACI code with
mixture ratio 1:2:4 is 300 kg

and the amount of sand is 0.42 m3
and the amount of cource aggregate(gravel) is 0.84

regards

civil engineer
Ahmed Sami
IRAQ

Is This Answer Correct ?    9 Yes 5 No

how many cement bag in 1m*m*m..

Answer / mahammad dawood mandokhail

the volume of 1 cum cement bag is 0.034
so
1/0.034=29.41
or
one bag of cement is 50kg
so
50/0.034=1470
now
1470/50=29.41 that`s approximately equal to 30bags of cement.

Is This Answer Correct ?    4 Yes 0 No

how many cement bag in 1m*m*m..

Answer / a.k. max

if the portland cement density is 1505kg/cu.m. then in 1
cu.m. we will have 1505kg of cement. as a result in 1cu.m.
we have 1505/50=30.1 bags

Is This Answer Correct ?    4 Yes 1 No

how many cement bag in 1m*m*m..

Answer / m.shilpa

Density of cement is 1440kg/cum.
weight of 1 cement bag is 50kgs.
By dividing density by weigt of bag we can get number of
bags per cum.
Thatis 1440/50 = 28.8 bags.
we can do it in other form to.

1bag is equal to 35 litres of water
therefore 1cum =1000litres
total no of bags = 1000/35 =28.8 bags

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.

0 Answers  


what mean By core Billing

0 Answers  


How can i design the beam . Explain with one example

1 Answers   GMR,


What is bending moment?

1 Answers  


what is the allowable silt content in concrete?

7 Answers  


whate the size of bricks are avalable at site

5 Answers  


How much cum. Brick work can do by 1 madon

0 Answers   DLF,


How much cement,sand,bricks and water needed for 1square metre brick work?

0 Answers  


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

0 Answers  


1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?

1 Answers  


The slenderness ratio of a column is zero when its length ??

2 Answers   SSC,


Please explain soil invistigation methods?

2 Answers   IVRCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)