Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN
FROM NEARBY GRID AND GIVING THE SUPPLY TO THE GENERATOR
WHICH ACTS AS MOTOR. WHAT IS THE NEED OF RUNNING THE
GENERATOR AS MOTOR?

Answers were Sorted based on User's Feedback



AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO..

Answer / bikash c pal

I think The question who have asked, wanted to ask that "AT
THE TIME OF START-UP A POWER PLANT....." & NOT "AT THE TIME
OF INSTALLING THE POWER PLANT ...."-------------If my above
assumption is true, then the answer WILL BE as follows :-

TO BRING THE GENERATOR NEAR TO SYNCHRONUS SPEED DURING
START UP.

Is This Answer Correct ?    2 Yes 1 No

AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO..

Answer / natrajan tt

normally nobodies given to the supply directly to the
generator.In a power plant installation time they are drawn
supply from grid and given to the step down transformer like
11kv/430v for boiler and turbine auxiliaries startup use,
otherwise if ur possible to giving the supply to generator
it will act like a motor.Breaker capacity & Cable size or no
of runs to be added.

Is This Answer Correct ?    2 Yes 1 No

AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO..

Answer / venkatesan.j

In a gas power plant during initial light up the generator
is acted as motor to run the compressor to produce the
necessary air for compustion in combustion chamber.

Is This Answer Correct ?    1 Yes 0 No

AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO..

Answer / s.p.p.pathirana

The perpose is connecting grid power to the power plant
generators for syncronized both the system such as
(volt,freqency,and phase sequence)generator or alternator
has coupled to the engine. according to the question that
motor will turn engine to the oposite derection and engine
may damaged. there for generator have protection system to
prevent this. its call reverse power protection. power
plant for support to the grid and have connected grid power
cable to the generators through individual there circuit
breakers. generator breaker cannot close with engine
standby mode. if this correct please try to understand.

Is This Answer Correct ?    0 Yes 0 No

AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO..

Answer / ashish patil

In order to produce residuual magnitism there is seperate
exiter so there is no need to run generator as motor.

Is This Answer Correct ?    0 Yes 2 No

AT THE TIME OF INSTALLING THE POWER PLANT POWER IS TAKEN FROM NEARBY GRID AND GIVING THE SUPPLY TO..

Answer / dayal varma

to chek the capacity of the cables and winding of the
generator are able to work in such a high power

Is This Answer Correct ?    2 Yes 8 No

Post New Answer

More Electrical Engineering Interview Questions

In a d.c current, the power is the product of voltage and current. This relationship does not always apply to effective(r.m.s) values in an a.c circuit. Explain the reason for this.

2 Answers  


How I calculate the ELCB for circuit breakers?

0 Answers  


why the the electrical machine coil are damage ? How to prevent it?

2 Answers  


What causal system?

1 Answers   NTPC,


what is the relationship between current and frequency in AC circuit?

3 Answers  


What is Grounding?

2 Answers  


12.5 KVAR capacitor 440V gas filled, Its used for windmill purpose, How can i know about microfarad value for this capacitor

2 Answers  


In a star(primary) to delta(secondary) transformer,how you take the neutral point?

3 Answers   HLL,


roles of owslaw explain?

3 Answers   BSNL,


How to calculate the External Resistance required for 60HP slipring motor in case no any data of the Motor is available???

0 Answers  


What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA

0 Answers  


IF 5000amp current on LT 440V. then how much it will draw amp on HT 11KV side

10 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)