why when we perform SCC of an alternator we always get a
straight line even when 125% rated current is flown?
Answer / moody
nice question
we got astraight line becas when we make ashort circuit on
the armature winding so only alittle net mmf is produced
from the field and armature reaction so the field current
used not exceeding 20 % of the field current for rated
voltage and in the drawing os o.c.c this region is
astraight " non saturation"
draw the phasor diagram and u will see the answer by ur self
| Is This Answer Correct ? | 7 Yes | 4 No |
hi, i have completed B.tech Chemical enggneering, plz can anyone provide me GVK BIO company's interview questions. iam attending the interview for the first time..
what is vacuum....?
For amonia manufacturing process if pressure, temperature would be increase over optimum level what would be happen?And what steps should be taken?
What is some common piping materials used to transport slurries?
COMPUTER PROGRAMMING FOR ENGINEERS - EXAMPLE 17.3 : (a) The byte is the basic building block of computer data used in chemical engineering process simulation where 16 bits make a word, 4 bits make a nibble, 32 bits make a quad word and 8 bits make a byte. Then how many nibbles are there in a megabytes? (b) In computer data items, let : 1 bit - counts from 0 to 1, 8 bits - counts from 0 to 255, 16 bits - counts from 0 to A. What is the value of A? (c) In a binary system of 4 bits, if 1100 = 12, 1101 = 13, 1110 = 14, 1111 = 15, B = 16, then guess the value of B. (d) By using any form of tools, find the exact value of 2 power 64 or 2^64.
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
Define a barometric condenser?
Is there any way to slow coke formation in ethylene furnaces?
what is the meaning of flaring
QUANTUM CHEMISTRY AND CHEMICAL ENGINEERING - EXAMPLE 31.1 : As an approximation, let v = Zc / 137 where v is the radial velocity for 1 s electron of an element, c is the speed of light, Z is the atomic number. For gold with Z = 79, find the radial velocity of its 1 s electron, in term of c and percentage of the speed of light. (b) As an approximation, let A x A = 1 - Z x Z / 18769 where A is the ratio of the relativistic and non-relativistic Bohr radius. Find the value of A.
What are some common problems associated with dilute phase pneumatic conveying?
Explain what are the criteria involved in choosing mass balances for components?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)