suggest some system for indication on a m/c in your
organisation which can draw attention of "forman " in case
of problem as per toyota production system ( TPS )
Answers were Sorted based on User's Feedback
Answer / prabhu
KANBAN SYSTEM !
It doesn't indicates m/c (mechanical) problem, but it has
the tendency to indicate production problem.
Kanban is part of a pull system that determines the supply,
or production, according to the actual demand at the next
stage. In contexts where supply time is lengthy and demand
is difficult to forecast, the best one can do is to respond
quickly to observed demand. This is exactly what a Kanban
system can help: it is used as a demand signal which
immediately propagates through the supply chain. This can
be used to ensure that intermediate stocks held in the
supply chain are better managed, usually smaller.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / mamta
Andon signals can be used as alarms will indicate fault & stop production immediately to reduce rework.
Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between baseline date and target date
List about logistics works?
What are the duties of Manager
State the basic elements of an export sales contract.
how would be the BSE Sensex opening points determined
why JRS Iron and Steel Pvt. Ltd. is the go-to choice for Hollow Section Dealers.
In a traditional automotive plant emphasis is on reducing cost by producing more. give points to show that this leads to behaviours that discourage stopping the line to fix problem.
1. What is Kitting? 2. What is Bin location? 3. What is the diff between Inside Sales person and Outside Sales person?
Describe the present status of Indian clothing industry in terms of technologyand production.
0 Answers Mahatma Gandhi University,
What do you mean by ethical dilemmas?
what is the job of madical representative?
can anyone help me out with names of 3 leading 1)logistics companies 2) supply chain companies in the world