IN THERMAL POWER PLANT WHY WE ARE USING SINGLE SHAFT FOR
THE COUPLING OF HP,IP&LOW PRESSURE TURBINES....WE CAN USE
INDIVIDUAL SHAFT FOR EACH TURBINE....?
Answers were Sorted based on User's Feedback
Answer / phani
however 3 turbines are having individual shafts only.
may be in some designs HP & IP are in single shaft and LP
only in another shaft for 110 MW BHEL design.
For any 500MW, All 3 turbines are coupled with individual
shafts only.
this concept is bases on Torque and Steam pressure.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / pradeep patel
according to me it can be very easily understood by an
example of multi cylinder i.c. engine in which output of
all of the cylinders is transferred to only 1 shaft.if
power is transfered to only 1 shaft the output can be
controlled very easily by using only 1 gear box & other
supporting arrangement. the another benifites are lower
initial cost & compactness of mechanism.
| Is This Answer Correct ? | 2 Yes | 1 No |
My parents green card holder and sister is citizen so... . I m applying for spring 2010 for F1 visa... how can i convince visa officers for visa?
what is cavitation ?
Pipe Lin Question
I'm a first year student of B.E Mechanical Engineering... How should i prepare myself for getting selected in campus interviews from now itself...? What books should i refer....?
What are the benefits of cycloidal gears?
difference between lead screw and ball screw???
Examples of good insulators.
what is routh,s law in thermal engineering ?
which material used in railway track
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
is pneumatic cylinder can be used as hydraulic cyclider for same pressure.
how you want your manager to be? what is the think like is your previous manager? why you want to change the job? would you like to team or individual ?why? how you react when manager shout?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)