A can do a piece of work in 15 days, which B can do in 10
days. B worked at it for 8 days. A can finish the remaining
work in

Answers were Sorted based on User's Feedback



A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / shah nawas khan

18days

Is This Answer Correct ?    4 Yes 7 No

Post New Answer

More General Aptitude Interview Questions

A sum of Rs 312 is divided among 100 boys and girls such that every boy gets an amount of Rs 3.60 and every girl gets 2.40 Rs. Calculate the number of girls in the group.

0 Answers   CGI,


please send the marketing aptitude,computer knowldege for sbi clerical exam

1 Answers   State Bank Of India SBI,


If the diagonals of a rhombus are 8 cm and 10 cm respectively what will be the area of the rhombus? (a) 35 sq cm (b) 40 sq cm (c) 30 sq cm (d) 20 sq cm (e) None of these

2 Answers  


i want some model question papers in banking sector

1 Answers   HDFC,


Mahesh and Ramesh are questioners. The time taken by Mahesh and make a question is double of that taken by Ramesh. If Mahesh made 3/2 questions less each minute and Ramesh made 3 questions less each minute, to make m questions, the time taken by Ramesh would be 2n minutes less than that taken by Mahesh. If Ramesh takes n minutes to make m questions, find the number of questions that Ramesh can make in a minute?

0 Answers   Cap Gemini,






4 men can cross a bridge in 3,7,13, 17 minutes. Only two can cross the bridge at a time. The time taken by the two to cross the bridge is equal to the time taken by the slowest person of the two. Find the minimum time to all of them cross the bridge?

0 Answers   Accenture,


A certain type of mixture is prepared by mixing brand A at Rs.9 a kg. with brand B at Rs.4 a kg. If the mixture is worth Rs.7 a kg., how many kgs. brand A are needed to make 40kgs. of the mixture?

0 Answers   Wipro,


Which of the following fractions is less than 1/3

0 Answers   Ramco,


"Raw" means ?

4 Answers   Geometric Software,


2/3 of corckery(plates) are broken, 1/2 have someother thing(handle) broken , 1/4 are both broken and handle broken. Ultimately only 2 pieces of corckery were without any defect. How many crockery were there in total.

2 Answers   Cadence,


One fast typist type some matter in 2hr and another slow typist type the same matter in 3hr. If both do combinedly in how much time they will finish.

0 Answers   TCS,


In a certain format TUBUJPO is coded as STATION. The code of which string is FILTER?

1 Answers   Accenture,


Categories