A can do a piece of work in 15 days, which B can do in 10
days. B worked at it for 8 days. A can finish the remaining
work in

Answers were Sorted based on User's Feedback



A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / rahul

3 days

Is This Answer Correct ?    26 Yes 1 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / gsri_nivas

3 is the correct answer

Is This Answer Correct ?    7 Yes 0 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / rose

3 days

Is This Answer Correct ?    10 Yes 4 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / naresh

suppose we have to produced 100 goods.
B can produce it in 10 days it means he produces 10 good
each day
A can produce same no of goods in 15 days it means he can
produce 100\15=6.67

if b works 4 a 8 days it means he produces 80 goods..
remainig 20 goods produce by A..
And he will take 20\6.67= 3 days..

so the answers is 3 days..

Is This Answer Correct ?    7 Yes 1 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / rajguru

fraction of work by A in one day = W/15
fraction of work by B in one day = W/10
work completed by B in 8 days = W/10 * 8
fraction of work remaining = W(1-8/10)=2/10=1/5
time taken for A = 1/5 / 1/15= 3

Is This Answer Correct ?    8 Yes 3 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / vishal pitaliya

A can do a piece of work in 15 days

B can do in 10

b completes 8 day work

remaing work is of 2 day

A takes 1.5 time much than B

so 2*1.5=3

Is This Answer Correct ?    5 Yes 0 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / ronak

3 is a right ..
rajguru is right

Is This Answer Correct ?    3 Yes 1 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / krunal

naresh is correct

Is This Answer Correct ?    2 Yes 0 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / nixson

Viral can do a piece of work in 10 days

So in 1 day he does 1 / 10 of the work

Raja can do a piece of work in 15 days

So in 1 day he does 1 /15 of the work

Together in 1 day they finish 1/10 + 1/15 = 5/ 30 = 1/6 of the work

Together they can finish the job in 6 days ANSWER

Is This Answer Correct ?    1 Yes 0 No

A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can f..

Answer / rajasekar

(a) 2 days
(b) 3 days
(c) 5 days
(d) 10 days

Is This Answer Correct ?    13 Yes 15 No

Post New Answer

More General Aptitude Interview Questions

The speed ratio of two trains is 5:7,first train is travelling at a speed of 350 km/hr, what is the speed of the second train?

3 Answers  


The minimum token cost is Rs. 100, which grants the token holder to travel up to a distance of 10 miles. And for every additional mile travelled, the charge is Rs. 10. A minimum luggage weight of 10 kg is not charged, after which it is charged at Rs. 1 per kg. During a specific journey, suppose you carry a weight of 'k' kg, and a distance of 'p' miles is travelled, which equation will indicate the correct total charge to be paid by the traveller?

0 Answers   Cap Gemini,


In how many ways 4 letters can be posted in two post boxes?

13 Answers   TCS,


a)in four digit no the fourth number is four time more than the second digit b)in four digit no the third number is three time less than the second number c)in four digit no the first digit is thrice than the fourth digit d)sum of these three combination is 11

0 Answers  


A new apartment complex purchased 60 toilets and 20 shower heads. If the price of a toilet is three times the price of a shower head, what percent of the total cost was the cost of all the shower heads?

1 Answers   Accenture,






A thief steals half the total no of loaves of bread plus 1/2 loaf from a bakery. A second thief steals half the reaming no of loaves plus 1/2 loaf and so on. After the 5th thief has stolen there are no more loaves left in the bakery. What was the total no of loaves did the bakery have at the beginning.

0 Answers   Infosys,


8 years ago i was 5 times as old as my son.today i am 3 times his age.how old i am

5 Answers   TCS,


f(x) = 10x3 + ax2 + bx – 63. If f(-1) = -8 and one of the factors of the given equation is 2x + 3, then find the values of 'a' and 'b'.

0 Answers  


Find the correct meaning of the following phrase: To be in the air

0 Answers   Hexaware,


A man collects cigarette stubs and makes one full cigarette with every 8 stubs.If he gets 64 stubs how many full cigarettes can he smoke.

0 Answers   Infosys,


PlZ Send me the Banking(Axis) Sector Question paper to my id?

0 Answers  


What number comes next in the sequence: 10, 9, 60, 90, 70, 66?

12 Answers   Google,


Categories