raleigh method
No Answer is Posted For this Question
Be the First to Post Answer
if 300 hrs not comleted at wat interval b.c,d checks og take place
i Have 1000kva 11/.4 kv voltemp make t/f Its a 2 year old. i wants to known how much iron losses & copper loses during no load condition.
how will you find out the fuse failure by remote operation?
what is an S.C.R. and how do they work?
hoe we can exlain the effect of caoacitor in fans????????
What is the difference between split AC and Casste AC?
For 6600/433 distribution transformer we apply secondary side 433 volts how much voltage in primary side.
why the supply frequency in india is 50hz?
what is Bucholtz Relay test???? Explain??
why there is a humming noise in transformer
What is meant by rating error prevention in breaker??
length of 4 core cable 95mm from substation LV VFD panel to Motor at field approximately 150 meter. Motor stop and power has been isolated from LV MCC ( Substation )to disconnect Motor for services. After Motor completed service propose to reinstall and reconnect Motor Cable, found earth cable sparkling during touching at metal / motor body. Inspect by clamp meter found earth cable have current flow AC 1-2amps and all earth cable at MCC LV also have current flow as same value. why it is happen?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)