The PRIMARY objective of conducting a post-implementation
review is to assess whether the system
A) achieved the desired objectives
B) provides for backup and recovery
C) provides for information security
D) documentation is clear and understandable

Answers were Sorted based on User's Feedback



The PRIMARY objective of conducting a post-implementation review is to assess whether the system A..

Answer / mahmud

A) achieved the desired objectives

Is This Answer Correct ?    53 Yes 3 No

The PRIMARY objective of conducting a post-implementation review is to assess whether the system A..

Answer / an

A) achieved the desired objectives

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

If an application program is modified and proper system maintenance procedures are in place, which of the following should be tested? The: A. integrity of the database B. access controls for the applications programmer C. complete program, including any interface systems D. segment of the program containing the revised code

1 Answers  


When reviewing a system development project an IS auditor would be PRIMARILY concerned with whether: A. business objectives are achieved. B. security and control procedures are adequate. C. the system utilizes the strategic technical infrastructure. D. development will comply with the approved quality management processes

1 Answers  


Which tests is an IS auditor performing when certain program is selected to determine if the source and object versions are the same?

4 Answers  


In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.

1 Answers  


The responsibilities of a disaster recovery relocation team include: A. obtaining, packaging and shipping media and records to the recovery facilities, as well as establishing and overseeing an offsite storage schedule. B. locating a recovery site if one has not been predetermined and coordinating the transport of company employees to the recovery site. C. managing the relocation project and conducting a more detailed assessment of the damage to the facilities and equipment. D. coordinating the process of moving from the hot site to a new location or to the restored original location.

1 Answers  






Which of the following controls will detect MOST effectively the presence of bursts of errors in network transmissions? A. Parity check B. Echo check C. Block sum check D. Cyclic redundancy check

3 Answers  


Controls designed to ensure that unauthorized changes are not made to information residing in a computer file are known as: A. data security controls. B. implementation controls. C. program security controls. D. computer operations controls.

1 Answers  


The database administrator has recently informed you of the decision to disable certain normalization controls in the database management system (DBMS) software to provide users with increased query performance. This will MOST likely increase the risk of: A. loss of audit trails. B. redundancy of data. C. loss of data integrity. D. unauthorized access to data.

1 Answers  


An organization is considering installing a LAN in a site under construction. If system availability is the main concern, which of the following topologies is MOST appropriate? A. Ring B. Line C. Star D. Bus

1 Answers  


Which of the following would be considered an essential feature of a network management system? A. A graphical interface to map the network topology B. Capacity to interact with the Internet to solve the problems C. Connectivity to a help desk for advice on difficult issues D. An export facility for piping data to spreadsheets

1 Answers  


Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review

1 Answers  


IS auditors are MOST likely to perform compliance tests of internal controls if, after their initial evaluation of the controls, they conclude that: A. a substantive test would be too costly. B. the control environment is poor. C. inherent risk is low. D. control risks are within the acceptable limits.

2 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)