The PRIMARY objective of conducting a post-implementation
review is to assess whether the system
A) achieved the desired objectives
B) provides for backup and recovery
C) provides for information security
D) documentation is clear and understandable

Answers were Sorted based on User's Feedback



The PRIMARY objective of conducting a post-implementation review is to assess whether the system A..

Answer / mahmud

A) achieved the desired objectives

Is This Answer Correct ?    53 Yes 3 No

The PRIMARY objective of conducting a post-implementation review is to assess whether the system A..

Answer / an

A) achieved the desired objectives

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

A digital signature contains a message digest to: A. show if the message has been altered after transmission. B. define the encryption algorithm. C. confirm the identity of the originator. D. enable message transmission in a digital format.

2 Answers  


During an IS audit of the disaster recovery plan (DRP) of a global enterprise, the auditor observes that some remote offices have very limited local IT resources. Which of the following observations would be the MOST critical for the IS auditor? A. A test has not been made to ensure that local resources could maintain security and service standards when recovering from a disaster or incident. B. The corporate business continuity plan (BCP) does not accurately document the systems that exist at remote offices. C. Corporate security measures have not been incorporated into the test plan. D. A test has not been made to ensure that tape backups from the remote offices are usable.

1 Answers  


Which of the following would be MOST appropriate to ensure the confidentiality of transactions initiated via the Internet? A. Digital signature B. Data encryption standard (DES) C. Virtual private network (VPN) D. Public key encryption

1 Answers  


Which of the following is the MOST critical element of an effective disaster recovery plan (DRP)? A. Offsite storage of backup data B. Up-to-date list of key disaster recovery contacts C. Availability of a replacement data center D. Clearly defined recovery time objective (RTO)

1 Answers  


Following the development of an application system, it is determined that several design objectives have not been achieved. This is MOST likely to have been caused by: A. insufficient user involvement. B. early dismissal of the project manager. C. inadequate quality assurance (QA) tools. D. noncompliance with defined approval points.

1 Answers  






Antivirus software should be used as a: A. detective control. B. preventive control. C. corrective control. D. compensating control.

1 Answers  


An IS auditor reviews an organization chart PRIMARILY for: A. an understanding of workflows. B. investigating various communication channels. C. understanding the responsibilities and authority of individuals. D. investigating the network connected to different employees.

1 Answers  


Which of the following business recovery strategies would require the least expenditure of funds? A. Warm site facility B. Empty shell facility C. Hot site subscription D. Reciprocal agreement

1 Answers  


Which of the following can identify attacks and penetration attempts to a network? A. Firewall B. Packet filters C. Stateful inspection D. Intrusion detection system (IDs)

1 Answers  


An IS auditor who has discovered unauthorized transactions during a review of EDI transactions is likely to recommend improving the: A. EDI trading partner agreements. B. physical controls for terminals. C. authentication techniques for sending and receiving messages. D. program change control procedures.

1 Answers  


While reviewing an ongoing project, the IS auditor notes that the development team has spent eight hours of activity on the first day against a budget of 24 hours (over three days). The projected time to complete the remainder of the activity is 20 hours. The IS auditor should report that the project: A. is behind schedule. B. is ahead of schedule. C. is on schedule. D. cannot be evaluated until the activity is completed.

1 Answers  


Which of the following fire suppressant systems would an IS auditor expect to find when conducting an audit of an unmanned computer center? A. Carbon dioxide B. Halon C. Dry-pipe sprinkler D. Wet-pipe sprinkler

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)