Answer / guest

Answer: C

The complete program with all interfaces needs to be tested
to determine the full impact of a change to program code.
Usually the more complex the program, the more testing required.

Is This Answer Correct ?    7 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following procedures would MOST effectively detect the loading of illegal software packages onto a network? A. The use of diskless workstations B. Periodic checking of hard drives C. The use of current antivirus software D. Policies that result in instant dismissal if violated

1 Answers  


Programs that can run independently and travel from machine to machine across network connections, with the ability to destroy data or utilize tremendous computer and communication resources, are referred to as: A. trojan horses. B. viruses. C. worms. D. logic bombs.

7 Answers  


An IS auditor performing a telecommunication access control review should be concerned PRIMARILY with the: A. maintenance of access logs of usage of various system resources. B. authorization and authentication of the user prior to granting access to system resources. C. adequate protection of stored data on servers by encryption or other means. D. accountability system and the ability to identify any terminal accessing system resources.

1 Answers   CISA,


An existing system is being extensively enhanced by extracting and reusing design and program components. This is an example of: A. reverse engineering. B. prototyping. C. software reuse. D. reengineering.

2 Answers  


Involvement of senior management is MOST important in the development of: A. strategic plans. B. IS policies. C. IS procedures. D. standards and guidelines.

1 Answers  






During an implementation review of a multiuser distributed application, the IS auditor finds minor weaknesses in three areas-the initial setting of parameters is improperly installed, weak passwords are being used and some vital reports are not being checked properly. While preparing the audit report, the IS auditor should: A. record the observations separately with the impact of each of them marked against each respective finding. B. advise the manager of probable risks without recording the observations, as the control weaknesses are minor ones. C. record the observations and the risk arising from the collective weaknesses. D. apprise the departmental heads concerned with each observation and properly document it in the report.

1 Answers  


Which of the following is a substantive test?

3 Answers  


Which of the following statements relating to packet switching networks is CORRECT? A. Packets for a given message travel the same route. B. Passwords cannot be embedded within the packet. C. Packet lengths are variable and each packet contains the same amount of information. D. The cost charged for transmission is based on packet, not distance or route traveled.

1 Answers   Karura Community Chapel,


An organization has contracted with a vendor for a turnkey solution for their electronic toll collection system (ETCS). The vendor has provided its proprietary application software as part of the solution. The contract should require that: A. a backup server be available to run ETCS operations with up-to-date data. B. a backup server be loaded with all the relevant software and data. C. the systems staff of the organization be trained to handle any event. D. source code of the ETCS application be placed in escrow.

1 Answers  


The PRIMARY purpose of undertaking a parallel run of a new system is to: A. verify that the system provides required business functionality. B. validate the operation of the new system against its predecessor. C. resolve any errors in the program and file interfaces. D. verify that the system can process the production load.

2 Answers  


In large corporate networks having supply partners across the globe, network traffic may continue to rise. The infrastructure components in such environments should be scalable. Which of the following firewall architectures limits future scalability? A. Appliances B. Operating system based C. Host based D. Demilitarized

1 Answers  


Which of the following would enable an enterprise to provide access to its intranet (i.e., extranet) across the Internet to its business partners? A. Virtual private network B. Client-server C. Dial-in access D. Network service provider

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)