Answer / nasir
System Testing: System testing that try to find out any
defect, bug or error from the whole system not only from
individual component.
User Acceptance Testing:Individual user requirement is
usually unit base, So how many easyway user can get their
information and system can work under maximum numbers of
condition.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sam
System testing is a defect finding mission, acceptance testing is not.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / dhirendra
befor i read your comments i was confuse abt system and UAT
testing but when i read your answer for the same i come to
know abt this so thanks for your comments
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / s gokul vikas
SYSTEM TESTING :
1) This testing is done by the tester itself by verifying
against user or client requirements
USER ACCEPTANCE TESTING :
1) This testing is done by the client or customer or end
user to check whether his requirements or functionalities
are working accordingly
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / hptester
sunitha ur answer is not clear and correct.
freinds can any explain dis correctly....
tank u
| Is This Answer Correct ? | 7 Yes | 10 No |
Answer / sunithayagnamurthy
Hi,
This is sunithayagnamurthy.
User accepting test: User accepting test means user has
tested it is working or not as per the requirment this is
called the user acceptence testing...
It is conducted by user ....this is conducted after
system testing ....
system testing: system testing is conducted by blockbox
test engineer. the blobkbox test engineer tested this is
working or not as per the requirment this is called the
blockbox testengineer....
If any mistakes is their please excuse
thanks & regards
sunithayagnamurthy
| Is This Answer Correct ? | 3 Yes | 30 No |
Can you explain boundary value analysis?
Can any one explain about USE CASES?
ad-hoc testing is not organized, it's not repeatable, it can't be tracked, and when it's complete, there's no proof that it was ever done. is it?
There is only requirements document. You have 10 days and 8 resources to release the system.At the end of the 8th day u tell ur TL that system is ready for release. How will you proceed with the testing process or in other words what all approach you will follow once you get requirements
Hi i am working in bangalore..I have 2yrs experience in manual testing,if there are any openings in ur company please let me know My email id is: vdivyamdu@gmail.com
Can you explain steps in function points?
What is Bicycle Testing?
6)If a project produces 1000 defects per 150 function points, then it is a: A)Baseline B)Benchmark C)Size D)None
what is statergy?
on what basis a tester writes test cases,i mean is it only based on FS and if so how can they know that a certain no of test cases can be written even b4 they write the test cases.bcoz a test plan contains how many test cases to be written by each tester.
What is the goal of Software Configuration Management(SCM? a.)Configuration Identifier b.)Configuration Control c.)Process Management d.)All options.
What is the initial stage of testing?