what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Answer / guest
Entry criteria: Before Integration criteria all unit test
cases should be passed and Unit testing should be completed.
Exit: When Integrated modules are working as per their
requirement and all integration test cases should be passed
without any critical/Major defects
Is This Answer Correct ? | 5 Yes | 1 No |
unit testing output is entrylevel criteria for integration
testing.the same output is exit level criteria for unit
tsting.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / madhubabu
Entry criteria: 1)first study the SRS document and
understand the current project.
2)test environment established.
3)receiving the software build from the
programmers
exit criteria: 1)all major bugs are executed.
2)all expected test cases are solved.
3)time exceeded.
4).all minor bugs are solved
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / suvarna
Entry and Exit criteria means
Entry includes Pre Conditions like SRS(Usecases, Activity
diagram, mockup screens & HLDD, LLDD.
Exit includes Post Conditions like Traceability matrix and
Sign off.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sandeep
Entry criteria start with R&A phase
Evaluating exit criteria has the following major tasks:
o Checking test logs against the exit criteria specified in
test planning.
o Assessing if more tests are needed or if the exit
criteria specified should be changed.
o Writing a test summary report for stakeholders.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / suneel reddy
Entry criteria is nothing but how to approach particular
thing?
suppose in Test plan entry criteria is functional
description and exit criteria is approach
Is This Answer Correct ? | 1 Yes | 4 No |
My Nokia is 3806 CMDA. It is always heat and the battery is down.Why is it happening ?
Define the role of qa in software development?
what appraoch do u use in your organisation to test the new build(tseting approach)?
I would like to know whether Zephyr, the test management tool takes a complex installation procedure?
What is difference between ach credit and the normal credit?
'configuration related errors' in testing means what?
What is test idea? What is tets plan?
Define quality for me as you understand it
What are estimations? How do you estimate?
how do i know that I am using 32 bit Windows
which comes first test strategy or test plan?
write an e-mail introducing yourself to the client as a QA ead is not in town.