what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Answer / guest
Entry criteria: Before Integration criteria all unit test
cases should be passed and Unit testing should be completed.
Exit: When Integrated modules are working as per their
requirement and all integration test cases should be passed
without any critical/Major defects
| Is This Answer Correct ? | 5 Yes | 1 No |
unit testing output is entrylevel criteria for integration
testing.the same output is exit level criteria for unit
tsting.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / madhubabu
Entry criteria: 1)first study the SRS document and
understand the current project.
2)test environment established.
3)receiving the software build from the
programmers
exit criteria: 1)all major bugs are executed.
2)all expected test cases are solved.
3)time exceeded.
4).all minor bugs are solved
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / suvarna
Entry and Exit criteria means
Entry includes Pre Conditions like SRS(Usecases, Activity
diagram, mockup screens & HLDD, LLDD.
Exit includes Post Conditions like Traceability matrix and
Sign off.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sandeep
Entry criteria start with R&A phase
Evaluating exit criteria has the following major tasks:
o Checking test logs against the exit criteria specified in
test planning.
o Assessing if more tests are needed or if the exit
criteria specified should be changed.
o Writing a test summary report for stakeholders.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / suneel reddy
Entry criteria is nothing but how to approach particular
thing?
suppose in Test plan entry criteria is functional
description and exit criteria is approach
| Is This Answer Correct ? | 1 Yes | 4 No |
Give an example of high priority and low severity,low priority and high severity ?
what is the differemce b/w test cases and test scripts?
Define test strategy.
what is entry and exit criteria?
What is the difference in responsibilities of programmers and qa analyst?
How to log defect in HP ALM
Can Regression test be done at all levels
steps for perfoming integration testing?
What if the project is not big enough to justify extensive testing?
what is exceptional flow ? how to write exceptional flow test cases ? please give me the answer.
What is extreme programming and what is it got to do with testing?
What is test execution/efficiency metrics?