What is Vertical and Horizontal traceablity?
Answers were Sorted based on User's Feedback
Answer / aashi
These are the types of Tracibilities:
Horizontal Tracebility: The tracing of requirements for a
test level though the layers of test documentation( eg.
test plan , test design, test cases specification)
Vertical Tracebility: The tracing of requirements though
the layers of developement documentation
| Is This Answer Correct ? | 10 Yes | 7 No |
Answer / vivek
Vertical Traceability: Mapping within the requirements
Horizontal Traceability: Mapping between the requirements.
both together called Bi Directional Traceability.
For Example: Requirements 'A' and Requirements 'B'
Mapping the traceability within either Requirements A or
Requirements B is vertical
Mapping the traceability between Requirements A and
Requirements B is Horizontal
| Is This Answer Correct ? | 7 Yes | 16 No |
if a project is long term project , requirements are also changes then test plan will change or not?why
Why you are selected software testing as career ?
how you setup steps to start a project
what are 6 microsoft rules used for user interface testing?
hi all, i am new to testing environment.i have two questions 1.what is the difference between volume test and load test.? 2.generally ,what is the output for stress testing.?because it is beyond the limit.and what is the use of stress testing?
what is visible state transaction test? give one example
Acceptance testing is designed whether or not the software is FIT for the user to use. The concept of FIT is important in both design and testing. There are four components of FIT .what r they
8. What would entice you to return?
What is white-box Integration Testing and its differences between Black box-Integration testing?
i m doing a course in manual testing ,they ll be conducting a online exam.i just need a sample question paper with answer.
On what basis test engineer can find out TEST SCENARIOS???
WHAT IS GUI TESTING