Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to caluculate APFC panel rating, my running Load is
1320KW, Present P.F 0.76 to 0.8 we need 0.98 p.f

Answers were Sorted based on User's Feedback



how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / maprayil

KVAr is square root of (KVA2-kW2). In your case the system KVAr at P.F. 0.76 lag is 1129 KVAr; and P.F. 0.80, it is 990 KVAr. (These are the KVAr values required to take your system P.F. to Unity or 1.00). Please note the following values:-

With a running load of 1320 kW, the Maximum Demand (KVA) of your system at 0.76 PF is 1737 KVA; and at P.F. 0.80, it is 1650 KVA. At a P.F. of 0.98, the Max Demand would be 1347 KVA (KVA = kW/P.F.).

Now that you have the system KVAR & KVA values, the simplest way is to calculate the system KVAR after P.F. is improved to 0.98 lag (your desired value). This can be worked by (considering initial P.F. 0.76):-

KVAR = Square root ((KVA+kW)*(KVA-kW))
= Square root ((1347+1320)*(1347-1320)
= Square root (2667 * 27) = SQRT 72009
= 268 KVAr.

So KVAR required for improving the P.F. of 1320 kW running load from 0.76 to 0.98 is 1129 KVAR (initial system KVAR) minus 268 KVAr (final system KVAR), i.e., 861 KVAr. This KVAR needs to be installed in multiple steps with automatic switching arrangement.

Is This Answer Correct ?    2 Yes 0 No

how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / manish mangla

Actually it is very simple.You know the present pf and
desired pf too.so you can use the formula:

Kvar=kwh(tan(inverse)phi1-tan(inverse)phi2)

Phi1=actual or present pf
Phi2=desired pf

Is This Answer Correct ?    1 Yes 1 No

how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / s. k. mishra

KVAR^2 = KVA^2 - KW^2 = KVA^2 - KVA^2 * pf^2= KVA^2(1-pf^2)

THEREFORE KVAR= KVA [(1-pf^2)]^1/2

Is This Answer Correct ?    0 Yes 0 No

how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / tajinder singh

kw=1320
present PF = 0.76
kva =1320/0.76
=1737
for unity pf u require capacitors Panel =1129 kVAr
for 0.98 pf u require capacitors panel =858 kVAr

Is This Answer Correct ?    2 Yes 4 No

how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / vijay kumar

APFC panel rating = 400 KVAR

Is This Answer Correct ?    9 Yes 13 No

how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / vijay

Kvar=KVA(1-P.F)
KVA=KW/P.F
Kvar=Kw(1-P.F)/P.F
=1320(1-0.98)/0.98
=250

Is This Answer Correct ?    20 Yes 33 No

how to caluculate APFC panel rating, my running Load is 1320KW, Present P.F 0.76 to 0.8 we need 0...

Answer / cibi

by using delsigma relations or fiuys charts apf panel rating
could be determined

Is This Answer Correct ?    18 Yes 36 No

Post New Answer

More Mechanical Engineering Interview Questions

Give five reasons why a reciprocating pump will reduce capacity or pressure when delivering water

0 Answers  


what is the uses of control rod?

2 Answers  


what is difference between main steam to dearator & pegging steam to dearator?

1 Answers  


What is the unit of viscosity?

0 Answers   John Deere,


How to check the round duct measurement

0 Answers  


Which type of gear train used in Wrist watch?

6 Answers   Bhel, Escorts, L&T,


give an example whenu should initiative and took the lead.

0 Answers  


Is it ABS AH 36 material equivalent to IS 2062 Gr B material.

5 Answers   CPF, Mukand,


what is the responsibility of production department ?

1 Answers  


what is the material of radiator sleeves or mesh?

0 Answers  


how can you calculate angle of bite practically???

1 Answers   JKN Limited, SVNIT,


Would you be able to join our organization in a month"s time?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)