Explain Gas Turbine startup and shutdown sequences
We have ZR22G-100-S-A-E-T-T--E-A/CV/F1 Model Zirconia Oxygen analyser which is Yokogawa make. I kept the analyser in Flue gas path at Air pre heater area. My plant is 7.5MW Biomass power plant. For a particular fuel, Coconut Husk which contains Sodium and Potassium chlorides iam not getting proper reading, Analyser output always Zero. I calibrated the analyser and it is OK. For Other fuels like Wood chips, Cholam waste, DOB, Groundnutshells, Ply wood waste and all iam getting actual percentage of Oxygen. What is the main reason behind this draw back?
How many mode are in ups?
WHAT IS DIFFERENCE BETWEEN TWO WIRE RTD AND THREE WIRE RTD?
how to calibrate steam control valve in steam turbine
What inherent design and operating principles are included in a modern control system to use predictive maintenance practices to increase overall system reliability?
Can anybody explain about wellhead control system.
what is compensation? temprature & pressure
what is the full formof HART
What is furnace draft control?
What is the Difference between E/P Positioner and I/P positioner in a control valve? In which applications the respective positioners are used in?
What standards are used for earthing of field instruments?
I have seen the Temperature element (T/C & RTD) installed in process line on 45 degree position, Why? What it mean? How many types of tapping position for temperature elements?