Can a 5 core cable one end with a 32A 3p+N+E plug and the
other end 32A 3p+E be used on a generator?
How to calculate pitch, gauge of winding wire, and No. of turns for 30HP, 3 phase, 4 poles 50Hz, 380V induction motors
i have one source transformer with the capacity of 50KVA, connected with two loads 10kw and second one is 15kw.. how can i calculate first load in KVA and second one in KVA .. because Kva rating, power factor rating of of transformer is different from the load… there must be some way to calculate load KVA rating and power factor….
what are the major difference between 3phase 3wire and 3phase 4wire trivector meter?
keeping in view of parallel operation which of the 3 phase transformer connection are possible? a)delta-delta to delta-star b) delta-delta to star-delta c) star-star to delta-delta d) delta-star to star-delta
What is AVR? Explain the function AVR?
what is meant by leakage current of a capacitor?
what is real time system type definition
my diploma certificate in my higher education college
What is meant by Load Encroachment in OHL Feeder Protection?
transformer cooling fan kharab ho jaye to 1-off kar dena chahiye 2-load kum kar dena chahiye 3-koi frrk nhi padta 4-sub galat hai. choose right option
2 Answers PGVCL Paschim Gujarat Vij Company Limited,
Why corona takes place?
can we coorect P.F. OF 320 KVA ALTERNATOR AT LOCAL SITE WITH RATED .8 PF LAGGING.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)