what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Answer / shilpa reddy
Entry criteria means when we should start testing.this
comes in to existence
1)after preparing complete & correct testcases.
2)after creating testing environment
3)after recieving a stable build from the development team.
Exit criteria means when we can stop testing.This comes in
to existence,
1)after completion of all modules testing
2)after completion of all major bugs resolving
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / ramesh b
Entry Criteria: This defines the minimal requirement to
start the testing activities in the test cycle. For
example, Stable Test environment, Approved Test cases,
Valid Test data , etc.
Exit Criteria: This defines the coditions/ statements which
can conclude the testing. Exapmple, For fixed Bid Projects(
one full cycle of Functional Testing). For other projects (
Testing continued until all high priority defects are fixed
or do not exist.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / mads
Entry criteria is what has been agreed by relevant parties
as to what needs to be completed before a particular phase
of testing can begin. This can include fully documented
release notes, completion of other test phases etc. Exit
criteria is what needs to be completed before a test phase
can finish. This can mean a certain percentage of test
coverage, or based on there being only X number of critical
bugs. Hope this helps further
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / b.venkat reddy
entry criteria:-
1.when all the testcases are documented
2.when we took the complete prvious document
3.the complete specefications are approved
exit criteria:-
1.all the test cases successfully completed
2.no critical defects found
3.test results are documented
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arthieviswa
entry exit
unit test to check the modules white box testing
level is done
integration exit of unit test WBT + BBT
test
system test exit of integration 100% BBT
test
UAT exit of system test may be WBT
and compulsary BBT
arthieviswa
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / thilahavathi
Entry criteria
Timely enviornmental setup,starting the web
server and application server,successful implementation of
the latest build.
Reviewing the test basis,(such as
requirements,architectures,design,interfaces)
designing and priotritzing
Identifying necessary test data to support test condition
and test cases.
designing the test enviorment and identifying any required
infrastructure and tools.
Exit criteria,
The purpose of exit criteria is when to stop testing such
as at the end of test level or when a set of test specific
has specific goal.
Throughness measuressuch as coverage of code fuctionality
or risk.
Estimates of defect density or reliabilty measures
cost
bye
thilahavathi
London
residual risks such defects not fixed or lack of test
coverage in certain areas.
schedules such as those based on time to market.
Is This Answer Correct ? | 0 Yes | 0 No |
what is test metrics? difference between test matrix and test metrics? (Asked in Zensar Hyderabad today(17-1-12010))
What is the difference between function testing and system testing ? Please answer with proper pratical exmaple and avoid copy paste of text which written in book
what type of testing process is being followed in your company?
what types of testing you perform ?
What are the phases involved in software testing life cycle?
Anyone attended the manual testing interview with L&T infotech in recent past. please let me know the type of questions they can ask especially in PM round. Thanks
What is Glass Box testing?
Can you explain calibration in Testing?
Test approach to windows scheduler?
If u have to test the web page application and have to validate the Look & Feel of the application then how will u test it?
What is the smoke testing and sanity testing..?what is the difference?
what is diffrence between dynamic black box testing and dynamic white box testing