How can you test an application after production and
deployed in to the clients system, connecting to the
(Client's)server which is located somewhere in the US.
I mean how can you connect and test when it is at
maintenance



How can you test an application after production and deployed in to the clients system, connecting..

Answer / paul

1, tell the clients what to how to do(detail steps),after
that, get logs/traces from the clients
2, using a remote access method such as telnet/remote
desktop to control the system of clients if possible
correct me i am wrong

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Testing AllOther Interview Questions

what is testing , why will be testing ,what is responsibilities of tester

3 Answers   Infosys, TCS,


In a reactive approach to testing when would you expect the bulk of the test design work to be begun?

0 Answers  


What is the point of reference by which something can be measured? 1. Benchmark 2. Baseline 3. Metric 4. Measure 5. Indicator

4 Answers  


what is sdlc(Software development proces and stages of sdlc)..?

2 Answers  


What process model u r using 4 current project. (Eg: Water fall model, prototype model etc) and why?

1 Answers  






how to use bugzilla plz tell me details processs

0 Answers  


how cam www sites be tested

0 Answers  


What is SDLC and STLC? In analysis phase of SDLC, what exactly the testers will do?

0 Answers   Cap Gemini,


what are Link Speed available for FCOE SAN?

0 Answers  


What are the check points we need to consider while performing Database migration (ex: from oracle 8i to 9i)

0 Answers  


What is the difference between HBA, CNA and NIC?

2 Answers  


What Do You Think Is The Main Advantage Of using Test Management tool nowdays?

1 Answers  


Categories