How can you test an application after production and
deployed in to the clients system, connecting to the
(Client's)server which is located somewhere in the US.
I mean how can you connect and test when it is at
maintenance
Answer / paul
1, tell the clients what to how to do(detail steps),after
that, get logs/traces from the clients
2, using a remote access method such as telnet/remote
desktop to control the system of clients if possible
correct me i am wrong
Is This Answer Correct ? | 0 Yes | 1 No |
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), what is the INPUT and OUTPUT of each stage?
If 2x-y=4 then 6x-3y=?
What is meant by Regression testing? Differentiate Sanity and Regression testing?
wat r d schedules for testing?
0 Answers Mind Q Systems, QA Planet,
Please some one answer these Q's 1.Modules in Pension Domains ? 2.What Should we Test on Pension Domain.? Thanks in Advance Stewie
What are release notes and what it contents?
What is the dfd (data flow diagram)?
What is the difference between Testing and Code review?
An input field takes the year of birth between 1900 and 2004 what the boundary values for testing this field are?
who does the security check on the web site, other than login/password screens ?
what r the strategies & methodologies r u following in preperation of test cases based on usecase?
My team is globally dispersed and I spend most nights on conference calls. Is there any way out to handle my Quality Assurance team?