What are the check points we need to consider while
performing Database migration (ex: from oracle 8i to 9i)
No Answer is Posted For this Question
Be the First to Post Answer
What is differences between SCS-1,2 and 3
I. Product feasibility II. Software requirements III. Software Design IV. Acceptance test Which of the above reviews are necessary in order to ensure the traceability of requirements in the implemented software? 1. I and II 2. I, II, and III 3. II and III 4. II, III, and IV 5. I, II, and IV
Explain basis path testing?
What is service pack..what is the purpose of this..?This question was asked in an testing interview..that's why i posted this in this category..
1 Answers Infeneon Technologies,
Send me the interview questions
Explain static analysis?
What is the difference between interoperability and compatibility testing with some examples?
When is rtm (requirement traceability matrix) prepared?
How do you verify the test results and how do you proceed when you do not get the expected results?
What is the difference between debugging and testing?
How will you conduct risk analysis?
Explain test procedure?