What type testings will be conducted at system testing?Who
will conduct each test.

Answers were Sorted based on User's Feedback



What type testings will be conducted at system testing?Who will conduct each test...

Answer / purni

Your are right, but I want to try my version. According to
me system testing is testing the whole application. In
system testing there are 2 types
1. Functional - Testing the functionality of the
application.
2. Non functional - Testing the performance, stress test,
and secutrity test.

Who'll conduct each test?
This is decided by the test plan they prepare. In that
they'll decide who has to test what. And for doing the
performance and stress tests tester should have good grip
on the load runner which is seperate module from the manual
testing and the automation testing.

Is This Answer Correct ?    6 Yes 1 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / nag

after integration testing System testing will be done
combining all the modules.like after computer installed we
check all the modules like,hardware(ram,rom,sound
devices,processor etc ) and operating system and display
devices monitor
In system testing we do functional an non-functional
testing both
check this

http://www.guru99.com/system-acceptance-testing.html

Is This Answer Correct ?    1 Yes 0 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / sumathirajagopal

after finishing integeration testing the system testing
will be conducting.under system testing the tester will
conduct functional,performance,usability testing

Is This Answer Correct ?    1 Yes 2 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / lokesh chauhan

There are several answers but the meaning of all answers
are different from each other so which one is correct
answer plz any one can tell
thanks in advance

Is This Answer Correct ?    0 Yes 1 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / vijayalakshmi

System testing is nothing but tesing the Entire
Application.In this testing usually we will do
Usability,Functional,non functional testings.This total
testing is done by testers.

Is This Answer Correct ?    0 Yes 1 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / ramendra

In system testing we perform all type testing
like..GUI,Functional,Usability,Performance,load and etc.
Bc'z we test the whole system.
it's done by testing team.

Is This Answer Correct ?    0 Yes 1 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / saritha

System testing is a type of Black box testing. System
testing means testing the application. After the
integration testing, usually will do system testing.
Functionality, Regression, and performance testings comes
under system testing.

Is This Answer Correct ?    0 Yes 2 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / prasanna

Usability Testing
Functionality Testing
Non-Functional Testing

Is This Answer Correct ?    0 Yes 2 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / anitha

After complition of integration test tester can do system
testing with the help of Blockbox testing techniqcs.
system test divided into 3 types
1. usability test
2. functoinal test
3. non_functional test

Is This Answer Correct ?    0 Yes 2 No

What type testings will be conducted at system testing?Who will conduct each test...

Answer / bramhaji

one more testing is there after finishing the performance
testing i.e security testing.
under system testing the tester will conduct
1.usability testing
2.functional testing
3.performance testing
4.security testing.
this is the correct sequence of system testing

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Manual Testing Interview Questions

I Have 2 Yrs Experience in Manual I appiled in Job Portals still i m not getting any calls plz help me wat i need to do guide me please ?

1 Answers  


How many bugs occured will be considerd appropriate over 1000 steps when inspecting software? Describle an approriate Bug value.

0 Answers   ISB,


What is the exact difference between smoke testing and sanity testing.?

6 Answers   Accenture,


Can anybody explain about Mercury Quality Center " Dashboard tab" and its usage. Thanks in advance

3 Answers   IBM,


what is regression testing?

11 Answers   IBM, TCS,






How you will do regression testing on login form, After fixing the bug?

5 Answers  


What is 'Shows stopper Bug'

8 Answers   Yardi,


What types of testing will come under functionality testing and non functionality testing?Security testing is consider as functionality testing or non functionality?why its so?

10 Answers  


what is Test Factor

4 Answers  


When should you begin test planning?

4 Answers  


what are the different types of defects that can be found out in real time?How can we recognize what are the features to be tested and not to be tested in a system test plan?

2 Answers   Keane India Ltd,


When did u complete testing ? Which scenrio should not be in automation testing ? why ?

0 Answers  


Categories