1.how do you purchase the sheetmetal,machined components for
OEMS?
2.WHAT IS THE SYSTEM TO BE MAINTAINE FOR PURCHASE ACTIVITY?
3.HOW DO U DO THE PRICE NEGOTIATIONS & ITS PROCEDURES?
4.WHAT ARE THE PROBLEMS WILL FACE WHILE PURCHASING THE
COMPONENTS& WHAT IS THE SOLUTION TO OVERCOME BY THAT ONE
5.WHAT IS THE NECESSARY NOTES TO MAINTAIN THE PO& RELEASING
THE PO?
No Answer is Posted For this Question
Be the First to Post Answer
• What do you know about Petro Star Mount
What would your previous supervisor say your strongest point is?
Explain how does the pulley belts are to be aligned?
what is mean ovality?, how it is measured?
in regenrative cycle why to use two liquid(water&mercury) on steam genration cycle.
I am preparing for Assistant Motor Vehicle Inspector exam.If any body having old question papers please sarathnbr@gmail.com.
Respected Sir, I am preparing for J.E of RRB Chennai.Please send me all RRB Chennai solved paper in the year of 2004 to till date. My ID is musini_p@rediffmail.com Thanking you sir, Anand
How to conduct the Hydro & Pnumatic test as per DIN & ASME sTANDERS?
What is the importance of workshop?
How to run AutoCAD lips? What is the uses of lips?
How can an internal combustion engine be used for refrigeration?
• What are the skills and attributes you value most for someone being hired for this position?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)