what are iso,cmm,cmmi,level1,level2 etc in testing?
Answers were Sorted based on User's Feedback
Answer / ramachandra naidu
CMM:
----
-> Capability Maturity Model refers to a process
improvement approach based on process model.A Process model
is a strucutured collection of practices that describe the
characteristic of effective processes.
-> It has 5 levels.
i) Initial (Level 1)
ii) Repeatable (Level 2)
iii) Defined
iv) Managed
v) Optimizing
"Predictability,effectiveness and control of an
Organisation's software processes are belived to improve as
the Organisation moves up these five levels.While not
rigorous,the emprical evidence to date supporting this
belief." according to SEI.
CMMI:
-----
It contains
i) Quality Management system
ii) Management Responsiblity
iii) Resource Management
iv) Product Realization
v) Measurement,Analysis & Improvement
ISO:
----
International Organization for Standardization is an
international standard-stting body composed of
representatives from national bodies.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / ramachandra naidu
CMM:
----
-> Capability Maturity Model refers to a process
improvement approach based on process model.A Process model
is a strucutured collection of practices that describe the
characteristic of effective processes.
-> It has 5 levels.
i) Initial (Level 1)
ii) Repeatable (Level 2)
iii) Defined
iv) Managed
v) Optimizing
"Predictability,effectiveness and control of an
Organisation's software processes are belived to improve as
the Organisation moves up these five levels.While not
rigorous,the emprical evidence to date supporting this
belief." according to SEI.
CMMI:
-----
It contains
i) Quality Management system
ii) Management Responsiblity
iii) Resource Management
iv) Product Realization
v) Measurement,Analysis & Improvement
ISO:
----
International Organization for Standardization is an
international standard-stting body composed of
representatives from national bodies.
| Is This Answer Correct ? | 3 Yes | 4 No |
What if the project isn’t big enough to justify extensive testing?
is programming knowledge is necessary for testing
What are the contents in "Requirements Traceability Matrix" not in " Test Responsibility Matrix"?
as test eng ,what challenges have u faced in ur 3 projects so far? tell me atleast 3 challenges in ur projects? july 27 brahma412@yahoo.co.in
what is localization testing?is it a black box testing or white box testing?describe briefly?
What is endurance testing?
16 Answers Infosys, MBT, Syntel,
can someone give me a brief idea about embedded testing.. i know both embedded system concepts and testing concepts.. i just want to know what we have to do for embedded testing
please give possible testcases for a mobile phone
3 Answers Barclays, JPMorgan Chase, MSIIT, Wipro,
What is Pega Testing ?
5 Answers Cap Gemini, IBM, TCS,
What is the difference between volume and stress?
What is diff between Agile SDLC and TDD SDLC? Kindly let me know?
What is the difference between Incident and Defect. Anybody can answer it. Thanks in advance.
10 Answers iFlex, Kameda Infologics,