describe Bug life Cycle and the process taken in your
organization.
Answers were Sorted based on User's Feedback
Answer / murali.msc03
As soon as Test Engineer finds a Bug will Raise the bug as
in NEW Status and will post it development Tl and Will keep
it in Open Status and assign it to concerned developer. and
he can change the status of bug as duplicate, As designed,
not Reproducable, if it is a bug then developer will work
on it and give it as Fix status. Then Tester will retest
that bug and see that it is reproducable or not if it is
not reproducable then he will close the bug, if its
reproduce the same bug then keeps it in reopen status.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / sreenivas
In my organization bug life cycle starts with a defect I
found and will shoot a mail to development lead keeping a
status as NEW, then development lead is going to assign it
to the developer as status OPENED (if it is really a bug),
then developer is going to fix that bug and shoot a mail to
directly to me(test engineer) saying it is FIXED. I will
retest(FIX VERIFY) that bug and shoot a mail to the test
lead if it is FIXED and finally test lead will change a
status of the bug to CLOSED by shooting a mail.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / ramireddy
when we found a defect set the status as New and set the
severity bug revied by the in our seniour people based on
the severity they will set the priority and then they will
assign to the corresponding developer based on the priority
developer fix it,and then assign to corresponding tester
and again r-tested he will fix correctly close the bug,if
it is reproducible then re-assign to the corresponding
developer.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sra1
as soon as tester receive the build or software the tester
test the application and execute the test case.if the
tester found the bug in the testing he l"l termed as "new".
the pm analyse the defect & he l'l give to the developer.
the developer l"l "open" it now the developer is rectifying
the bug.and after solving he l"l "fixed" he bug.then the
regression testing is oocured whether the bug is fixed or
not if fixed then the tester l"l "closed" it.if the bug is
not rectified then then the tester reports a bug then the
pm do all the above activitys. tis is the bug life cycle
| Is This Answer Correct ? | 0 Yes | 0 No |
A 2 different developer design same function. After both completed. In testing engineer how do test that function?
How and what to functionally test in a web based application manually?
whenever the requirements are not given by the customer what type of testing you do?
what is bug triage?
What is the quality process is following in your organization.
McroSoft Six rules standard for Userinterface testing?
tell me 5 new requirements in ur project? plz urgent
What is black box testing, and what are the various techniques?
High sevirity, low prority bug
Test Case Design Techniques like BVA, Equalance partitioning, Error guessing?
what is difference between metric and report?
What is Resprint and Patch?