describe Bug life Cycle and the process taken in your
organization.
Answer Posted / sreenivas
In my organization bug life cycle starts with a defect I
found and will shoot a mail to development lead keeping a
status as NEW, then development lead is going to assign it
to the developer as status OPENED (if it is really a bug),
then developer is going to fix that bug and shoot a mail to
directly to me(test engineer) saying it is FIXED. I will
retest(FIX VERIFY) that bug and shoot a mail to the test
lead if it is FIXED and finally test lead will change a
status of the bug to CLOSED by shooting a mail.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
hi what are the test cases for web application..i need these example..please..mail me at mina_ims@yahoo.com
what is fusion testing and impact analysis???
what are the prerequisite conditins to test clientserver and web applications
WHAT IS PROTOCAL TESTING..EXPLAIN? L2, L3 PROTOCALS TESTING MEANS WHAT?EXPLAIN BRIEFLY
wat if fiddler and how it is used in tesing an application. please explain with a real time scenario
Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2
What are the different levels of manual testing?
What is the limit for test steps?It should be 10/20/30etc
what r the 5 major defects that u found in ur shopping related project?
Hi,friends i am going to write ICST certificate exam on augest.So can anybody post some of sample qusetions for ICST certificate exam.Really it will be useful for me
how will we change the server system time?
Which is the best testing model?
What do we need to build a quality QC team ? a QC manager with all junior QCs or a QC manager with all senior QCs?
What is bucket testing?
Can anyone tell me, What is wound fixing?