What is Suspension and Resumpetion criteria?
Answers were Sorted based on User's Feedback
Answer / ramprasad.s
Hi
suspension "Lack of Inputs" Required to Proceed
Resumption "Inputs are Available" Can proceed
sun_ramprasad@yahoo.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mfsi_priyankaa
We stop doing testing when there is unavailability of
resources or anything which restricts as to stop testing
that is called suspension criteria.
We again start the testing once we meet all our requirements
that is called resumption criteria.
| Is This Answer Correct ? | 0 Yes | 0 No |
How regularly you used to get the build and who used to installed build in software testing
What are the factors affecting a manual testing project and what are the ways to overcome it?
Hello Friends Can anybody give me some idea about telephonic interview on Testing.As a exp. what could be the questions , that u guys have faced or you know ? Plz help me out
What is pesticide paradox?
What is the diffrence between Beta Testting & Acceptance Testing
Thanks for all who are helping me and Wish u all happy new Year........ Now I have a one more question plz...help me what is the I DIFFERENCE BETWEEN Performance Testing,LOAD TESTING AND STESS TESTING JUST IN ONE LINE ANSWER give me with an EXAMPLE PLZ.... If u have time then post me to my mail id... thank u very much... for ur help.and if anyone wants to talk to me also u can add my id my id is given below. penisetty@gmail.com
what is analysis and interpretation of results?
what is N+1 testing
Suppose an application is on desktop, when you tries to open an application with Internet Explorer which is not launching. How do you debug or possibilities to overcome above problem?
4. A software error can be described as: a. A description of the relationship between two or more variables or set members in which the value of one does not influence the values of others. b. Any ill-advised, substandard, or temporary fix applied to an urgent problem in the (often misguided) belief that doing so will keep a project moving forward. c. The process in which developers determine the root cause of a bug and identify possible fixes. d. A mismatch between the program and its specification. 5. Select a reason that does not agree with the fact that complete testing is impossible: a. The domain of possible inputs is too large to test. b. Limited financial resources. c. There are too many possible paths through the program to test. d. The user interface issues (and thus the design issues) are too complex to completely test.
What are quality assurance and quality control?
Difference between Test Plan & Test Strategy?