Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Is There Any guy give me detail information
regarding "ISO/TS-16949-2002 " /TPM/QMS/SPC/MSA ???

Answers were Sorted based on User's Feedback



Is There Any guy give me detail information regarding "ISO/TS-16949-2002 " /TPM/QMS/SPC/..

Answer / guest

TS 16949 is european quality managment system related to
Automotive Industry. Almost all major automobile
manufacturer follow it except japanese companies like
Toyota. They have there own quality managment system which
I think is better then TS. TPM is Total production
managment, QMS quality management system. SPC statistical
process control, MSA not sure. They all are quality sytem
terms some time its different in differet org.

Cheers
Ali

Is This Answer Correct ?    5 Yes 2 No

Is There Any guy give me detail information regarding "ISO/TS-16949-2002 " /TPM/QMS/SPC/..

Answer / bmohanta34

MSA: Measurement Systems Analysis (MSA) for quality
improvement and Six Sigma training. Mine Safety Appliances
(MSA) is the world's leading innovator and provider of
quality safety and instrument products that protect and
improve.

Is This Answer Correct ?    2 Yes 2 No

Is There Any guy give me detail information regarding "ISO/TS-16949-2002 " /TPM/QMS/SPC/..

Answer / raghavendra rao h k

TS 16949 is european quality managment system related to
Automotive Industry. Almost all major automobile
manufacturer follow it except japanese companies like
toyota. TPM is a methodology to ensure zero waste attitude
( different industry use this terminology as differently
eg.. total productive maintenance,total perfromance
management etc) in general this is to reduce deviations and
reduce wastages to produce product at lower cost. QMS is
quality management system which deals with all quality
parameters to ensure zero compliance and customer
satisfactions. SPC is statistical process control it is
also a part of TPM here more concentrations on reducing the
variations there by achieving lessr deviations, MSA is
master schedule attainment which deals with planning vs
produced ( alwasy expressed in percentages) this is to the
speed up your product ( availability of the product in
market always to not to loose the customers)& it is for
material management in supply chain sectiions.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Mechanical Engineering Interview Questions

Maximum combustion temperature in gas turbines is of the order of 1100 to 10°c whereas same is around 00°c in i.c. Engine ? Why ?

0 Answers  


operation of flywheel

1 Answers  


• Tell me about the most fun you have had on the job.

1 Answers   Petro Star Mount,


Checking points in steering gear system?

0 Answers   RRB,


• What is the function of an isolator?

16 Answers   L&T, NTPC,


we use parallel flow heat exchanger to coo oil of 1000 EP viscosity,oftenly tubes may damage during cleaning etc what is proper way to clean cooler? How impurities decreased or vanished during working or in less teme job performed?

0 Answers  


how can we calculate the weight of a ms sheet when we know its dimensions in mm?

4 Answers  


How cn u measure to steam in kg/hr or ton/hr

6 Answers   Samsung, Samtel,


What is heavy water and what is its use in nuclear plants ?

0 Answers  


What are the most immediate challenges of this position that need to be addressed in the first three months?

1 Answers   Petro Star Mount,


What is meant by water hammering in steam line?why it is happening and how to overcome the same?

4 Answers  


Give an example of a time when you had to explain some new procedures to your co-workers for quality service delivery. How did you go about it?

0 Answers   Ex-Solite Oilfield and Engineering, Schwing Stetter,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)