how will you decide defect severity & priority?
Answers were Sorted based on User's Feedback
Answer / usha
with respective of user we decides the priority and
severity of the defects.
Is This Answer Correct ? | 6 Yes | 11 No |
Answer / sonia
how the bug is goin to effect the bussines of the client if
its there........... and how soon as a tester you think it
has to be fixed.
Is This Answer Correct ? | 3 Yes | 10 No |
Answer / b.venkat reddy
severity: how it is impact on the application
and how is it effecting the functionality
priority: how it is impotence on the application
and how early it should be fix.
severity decided by the functionality and
priority decided by the client.
Is This Answer Correct ? | 3 Yes | 10 No |
Answer / prasanna
priority: how soon it has to be fix
severity: how had the bug's.
Is This Answer Correct ? | 1 Yes | 11 No |
Is Test report same as Bug report....? I have to give Test Report to the client for my Application ....and as it started all of sudden i did not make the test cases and started of testing .....The bug Tracker where i report the bugs has a facility to download the Bug reported in word or in excel format....It has the detailed description of "version" of appliation tested, whom assigned .., resolved , closed..then the steps to reproduce the bug and all...Is the documnet test report...
differentiate test scenario & test case?
17 Answers Talent Sprint, Triniti Advanced Software,
what type of testing u are doing?
Can't we write test plan without any document with us or we definitely require the document for that
What is reporting hiearchy in testing? Who report to whop and complete hiearchy including developers
What do you mean to CAPA?
if there are 10 step in test cases while executing if their is mismatch at step 5 what is status of test case ? pass or fail or anything else? if require tab is not available then what's the status of test case?
How To write Wimax field testing test cases,,,,? both negitive and Positive,,,,follows rule Tringulation (Logitude and latitude)
can you plz tell me the all documents to be completed by a manual tester?
An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.
If there is any error in RTM. What you will do? Please reply it.
what are the key components of test plan document?