How do you decide the number of load generator machine required to run a test?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Load Runner Interview Questions

What is the scripting language using in LoadRunner?

13 Answers   IBM, Patni, Symphony,


What kind of problem can we face regarding hardware, software, network and memory bottleneck during the performance test?

0 Answers  


what is the 90% ile time in the analysis results?

4 Answers  


What is host?

0 Answers  


what is the differance between standard log and extended log?

5 Answers  






You are Performace Engineer and it is bottleneck how will identify it is Database Issue? Any one can justify? send to sss4702@gmail.com

0 Answers  


What is a rendezvous point?

7 Answers  


How many users can I emulate with loadrunner on a pc?

0 Answers  


how can we test clent server application and what is the preliminary requirement for load testing

1 Answers   IBM,


I have observed a scanrio executed/elapsed time in 16 seconds and succeded, when I set the duraion to 'Run Until Completion'. Same scanrio is failed/Gradually exited/stopped, when I set the time duration for 20 seconds (after the Ramp up has been completed). Why it is haapedned. Can anybody tell me the answer and solution also. Thanks in advance.

2 Answers  


If you had 6 hours of load testing to complete but the business unit wanted it turned over in 3 hours what would you tell them?

1 Answers   Satyam,


Parameterization need to be done when only one value need to be passed?

1 Answers   Patni,


Categories