Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How will you define capacitance?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

0 Answers   CDS, Engineers India Limited, TNQ,


what percentage of marks in B-TECH is needed for section engineering exam

1 Answers   RRB,


Why used in netural grounding transformer for netural side

2 Answers  


Is there any calculation to find unknwon(unferroled) phases R Y B in alternator,3 phase motor anybody shoot my problem. how can we notice this is the respective phase?

2 Answers  


why slipring motor , at full speed run as squirrel cage motor?

1 Answers  


A 150KW 440V motor is need to replace in the field instead of faulty one. what are the main parameter should I need to check?

1 Answers  


1000 W bulb takes 4.16 Amps at 240 volt then what will be the KWH & if i am using 1000 W bulb at 180 Volt the amps will be 5.55 then what will be KWH????????????????

2 Answers  


what is the full form of XLPE adn there use.

4 Answers   Voltas,


How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?

0 Answers  


Hi, My question is our total motor load is 55 kw.so what cable size required for main supply. Please reply

1 Answers   Maryam Enterprises,


IN MCCB AND MCB TERMINATIONS ARE IN-COMING ON TOP AND OUT GOING ON BOTTOM,IF WE TERMINATED INTERCHANGED TOP AND BOTTOM ITS WORKS?

2 Answers  


A electrical meter has load 500 kw. In 2 hr what rading will come on meter.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)