Explain major differences between routing maintenance and major maintenance.
No Answer is Posted For this Question
Be the First to Post Answer
how much repeitation for conventional and maivan formwork?
Name four load bearing elements (structural elements) in a framed building
in m25 concrete what is m.
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum
What should be the required steel in column, beam and slab
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
define prestressing? compare prestressing with post tensioning?
What is the density of most of construction materials?
Define block?
how to calculate length of bar
why seismic analysis not done during design of slabs
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)