How can hexavalent chromium be removed from aqueous waste streams?
No Answer is Posted For this Question
Be the First to Post Answer
What are some common methods for helium leak testing a vacuum system?
What is quicklime and what are the uses?
ENVIRONMENTAL ENGINEERING - QUESTION 22.1 : In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?
plz send the interview questions in the written test asked by hindustan petroleum corporation ltd.Iam a b>tech in chemical engineering.My written test is on feb 2008.urgent plz.send the questions to avazithraja@rediffmail.com
ENGINEERING ECONOMY - EXAMPLE 7.1 : In engineering economy, the future value of first year is FV = PV (1 + i). For second year it is FV = PV (1 + i) (1 + i). For third year it is FV = PV (1 + i) (1 + i)(1 + i) where FV = future value, PV = present value, i = interest rate per period, n = the number of compounding periods. By induction, what is the future value of $1000 for 5 years at the interest rate of 6 %?
What is screen analysis?
In Distillation Process heat transfer and mass tansfer will occur or not? alsowhere it will takes place?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
CHEMICAL ENERGY BALANCE - EXAMPLE 11.5 : According to Margules Equation, P = x(1) p(1) g(1) + x(2) p(2) g(2) for a two-component mixture where P is bubble pressure, x is mole fraction, p is saturation pressure, g is constant given by ln g(1) = x(2) A x(2). Find the value of A as a constant when P = 1.08 bar, p(1) = 0.82 bar, p(2) = 1.93 bar in a 50 : 50 mole fraction mixture. Estimate the pressure required to completely liquefy the 30 : 70 mixture using the same equation, by proving P = 1.39 bar. Take note that ln g(2) = x(1) A x(1), ln g(1) = x(2) A x(2).
Explain the advantages of using a ball mill over other conventional methods of crushing?
ENGINEERING PHYSICS - EXAMPLE 30.3 : (a) The quantum number m is given by m = -s, -s + 1. If s = 0.5, find the values of m. (b) | T > = (cos T) | V > + (sin T) | H >. The V and H states form a basis for all polarizations. Let cos T = 0.8. (i) If (sin T)(sin T) + (cos T)(cos T) = 1, find the value of sin T. (ii) For | T > = a | V > + b | H >, where a x a represents the probability of | V > and b x b represents the probability of | H >. Which one is more abundant, | V > or | H >? (iii) Find the value of T without using any mathematical tools.
In engineering economy, the future value of first year is FV = PV (1 i). For second year it is FV = PV (1 i) (1 i). For third year it is FV = PV (1 i) (1 i)(1 i) where FV = future value, PV = present value, i = interest rate per period, n = the number of compounding periods. By induction, what is the future value of $1000 for 5 years at the interest rate of 6%?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)