What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
No Answer is Posted For this Question
Be the First to Post Answer
why are you joining in this (applied post) job and your aim for this job
For M30 grade how much cement bags will need for one cubic meter qty
What is the density of DLC & PQC and how it is differ from normal concrete?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
How to Calculate the spacing of bars if we use 12 mm dia. bars instead of 10 mm dia. bars. Whereas the 10 mm dia. bars spacing given 0.250 as pr drawing. ?
whats is difference between anchorage length and development length
what are the types of dams
In Rcc work what ratio we need?
Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?
pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?
what is the difference between replacement of cement by groundnut shell ash
what is the standard gradient or slope for drainage?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)