what is drill down?
Answers were Sorted based on User's Feedback
Answer / rajeswari
Navigating data to lower level in the hierarchy with in the
cube
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / g.v.subramanyam
action of navagating thorough levels of data.
by drill down youn can reach the more refined or detailed
information.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / bosenthil
Drill down is a one of the concept in Drill.
Drill is nothing but an action of navigating data thru
levels of data. Drill down - with the use of drill down you
can reach more detailed information.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / vijay
analysing the data in different angles and levels
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / guest
move from summary information to detailed data.Drilling the
data into end level of hierarchy
| Is This Answer Correct ? | 1 Yes | 0 No |
what is canned universe and canned reports in bo?
how do you give security to universe ?
2 Answers InfoStep, Tech Mahindra,
what is xcelsius architecture?
What are the Errors in BO Pls Explain with Examples
2 Answers iFlex, Tech Mahindra,
it is possible to link two universes of separate functional domain ?
what is difference between folders and category ?
can i link two Universes having with different connection
Suppose i have the sinario like this column1: e1,e2,e3,e4 : column2: 1,0,1,0 : column3: M,F,M,F : in this i want to disply 1 is male and 0 is female which is added to the another column like column 4 what is the process?
what is optional prompt in boxi r2
HI EVERYONE I HAVE A QUESTION I FACED A QUESTITON FROM INTERVIEWER IN WEBI REPORT CREATING CROSS TAB REPORT FOR EX: YEAR IS COLUMN WISE AND MONTH IS ROW WISE AND INTERSECTIO IS REVENUES . HE WANTS BREAKS AT FIRST 3 MONTHS IN ROW LEVEL .. COULD U PLEASE TELL ME IF ANYONE KNOWS..
Hi, Webi report is created using universeA and this report needs to be shifted to UniverseB.So when i am trying to change report to new universeB from edit query properties, the report just hangs at the point of changing source to target.The reports which hangs mainly are the crosstab reports that has large data and many formulas. Any help on this is much appreciated. Thanks
when I am trying to schedule the report its running faster then I tried to run it manually?? why is it so that there is difference of time between scheduling and manual run for report