How do scheduling the report in BO XIR2? can you say what
are they steps?

Answers were Sorted based on User's Feedback



How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / v.sivakumar

Scheduling can be done in two areas

1. Infoview (which is explained in the before answer)

2. Through CMC (Central management console)

steps followed
1. Create a calendar according to your requirement.
2.Select the schedule tab in the object which you want to
schedule.
Note: In CMC object referes to report.
3.specify the destination
4.specify the format
5.select the calendar in the scheduling option and lookup
the calendar what you created for this requirements
6.schedule it

for more clarification mail me

Is This Answer Correct ?    12 Yes 1 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / abhishek

HI all
For sheduling any report open info view as admin
privilage ,then each and every reprot having a sheduling
option which is like a tab in bottom of each report click
on it then there is new window apper fill its all filed
like its sheduling time,its destination folder etc

Is This Answer Correct ?    13 Yes 4 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / neetu

Scheduling in BO XI R2 cab be done using infoview.Below
mentioned are the steps to follow

1.Open the appropriate folder of the report.
2.Towards the right side of the panel you can see the
reports available.
3.Below the report name "Schedule " option is available
along with History,properties.modify.
4.click on Schedule
5.A new window will pop up
6.Enter the details i.e When,Destination,Format etc.
7.Finally click on Schedule button.

The report will be scheduled

Is This Answer Correct ?    6 Yes 1 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / arabandisowmya

To Schedule a Web I document:
1. Locate the report you want to schedule.
2. Click schedule under the report link.
3. Select options
1. When
2. Destination
3. Format
4. Caching options(you can export the document as excel,
standard HTML, or PDF)
4. Click Schedule

Is This Answer Correct ?    3 Yes 1 No

How do scheduling the report in BO XIR2? can you say what are they steps?..

Answer / guest

XIR2 scheduling the report using scheduler in
administrator(Supervisor module).

Is This Answer Correct ?    4 Yes 9 No

Post New Answer

More Business Objects Interview Questions

HOw do u migrate from old version to the new version?

1 Answers   AOL,


What is the BO project Architecture? Explain in detail? Thanks in advance for ur answers?

2 Answers   Patni,


Why do we need metrics and sets?

1 Answers  


12. Report is running very slow and How do you increase its performance? 13. In infoview, I want to provide the hyperlink to view the report in pdf format or other format. is it possible to do it. 14. There is one report and need to add new cloumns which are not there in database. what is your approach.? 15. Did you face any ambiguous queries and how do you fix it?

3 Answers  


What is the size of data base?

2 Answers  






What is diff b/w Alias and Contexts in which situation we are using contexts instead of Alias?

2 Answers  


Can anybady tell me , what is the aggrigate awareness.how to use it . could u plz give me the practical example.

4 Answers   TCS,


Why do we need Three environments Like DEV, UAT, PROD. Need detailed answer please

1 Answers   HCL,


Can we create universe with no cache??

0 Answers  


Who launches the supervisor product in Business Objects for first time?

2 Answers  


can some body explain how migrate the BoXI r2 to BO 3.x and crystal reports XI r1 to Crystal report 2008 ?

0 Answers  


IF I WANT TO INSTALL BO ENTERPRISE PRODUCTS IN WINDOWS 2000 PROFESSIONAL SERVER ,WHAT SHOULD BE THE SYSTEM CONFIGURATION?

1 Answers   AG Technologies,


Categories