How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of
Ground Level Reservoir
No Answer is Posted For this Question
Be the First to Post Answer
What is logic behind the use of Steel bar insted of gold bar?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
how to reduce heat of hydration in concrete?
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
what post do you prefer to work in this company and why do you think you can serve better in such position?
what will be hook length of stirrups
what means if slump is less than 25mm and greater than 80mm?
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)