Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
No Answer is Posted For this Question
Be the First to Post Answer
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
1 cum of 60*25*25 block cost 187 dirhams. Find the cost of 1 sqm of block ?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
0 Answers GVR, Howe Engineering, L&T,
HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM
Slow setting admixture is used in mass concrete because of – –
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
What was your synopsis for thesis topic?
List out the densities of different construction materials such as brick, steel, sand, aggregate etc...
why steel is used in r.c.c why steel is used in r.c.c
which type of materials should be used for framed structure???
What is meant by struct column And stub column
3 Answers L&T, Shoba Devlopers, TATA,
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)