Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the curing time for plastring (all)?

Answers were Sorted based on User's Feedback



what is the curing time for plastring (all)?..

Answer / shadavali123@gmail.com

All plaster curing time 7 days

Is This Answer Correct ?    14 Yes 0 No

what is the curing time for plastring (all)?..

Answer / suresh bariya

Should be at least 10 days.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

150mm bricks size how many use 4.14 m3

0 Answers   True Builders,


Difference between tension and compression zone

3 Answers  


Mention what are the composition of a landfill?

0 Answers  


How may digree of freedon in four bar chain.

1 Answers  


Why can i adopt concreting insted of rubble solling in beds? In comoarision concreting is cheaper than the soling.

1 Answers  


why hanger rods are used in beam

3 Answers  


why is the column design?

0 Answers  


what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

0 Answers  


how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs

9 Answers   NCC,


what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.

2 Answers   TATA, Vastu Kirti Enterprises,


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

0 Answers  


Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)