What is sunrise meeting ?
Answer / kseb916
A meeting for time passing in kseb (In olden days all the fieldworkers were engaged in the field for the construction & mace of lines during sunrise .Nowadays SUNRISE MEETING... .COFFEE,,,. UNIONMEETING... TV BREAKIG NEWS SEEING..........
| Is This Answer Correct ? | 0 Yes | 0 No |
How can we calculate the Rating of DG Set for a 4 kw motor?
wat is the difference between BE &BTECH.
IT IS DESIRABLE THAT THE INCOMING MACHINE SHOULD BE A LITTLE FAST AT THE TIME OF SYNCHRONIZING.EXPLAIN?
describe the A.C. Generator Testing procedure
what is inductive voltage transformer? what is its application and how it differs from capacitive voltage transformer?
1 Answers NRSC National Remote Sensing Centre,
what is the disaddvantages of high power factor
what is meant by generator differencial protection?
how invertor convert the dc into ac give brif detail
10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)
IF THE OUTPUT OF A 100KVA, 415V GENERATOR IS STEPPED UP TO 11KV WITH A 500KVA TRANSFORMER,CAN THE TRANSFORMER BE LOADED ABOVE THE SOURCE GENERATOR RATING?
what is the formula of high voltage testing of three phase induction motor?
Why heat produce in AC machine higher than DC machine?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)