Why do we require transformer with less specific weight if supply frequency is increased?
No Answer is Posted For this Question
Be the First to Post Answer
respected sir, sir recentely i have applied for chennai and tiruvananthapur section enggineer and juniour engg in electrical dept. but still i donot get how i have to syart my preparation and also t the same time i donot know exactly what they r going to give in the examinations i mean which sections they r going to give i donot know exactly, can u prefer whichh books i have to follow and model papers or both boards
I have a question, I visit 01 site and face a problem, there is 2.5 ton Air Con working, when air con compressor is running at that time rectifier voltages are increasing upto 290-295 v and rectifier is giving main high alarm (rectifier is APC single phase, before starting compressor rectifier voltages was 230v. when air con is going off rectifier voltages are decreasing smoothly at its actual voltages 230v. Load on Genset phases is this: Red-13.5 amp AC (Air Con load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp AC (telecom system load), Genset phase to phase and neutral to phase voltages are also ok. These are 10 sites having same system and same rectifier APC brand at every site 02 genset are working but the problem is same at all these 10 sites. What will be the reason behind???
how does a tube light starter works?
Can we use MCCB with Auxiliary Contact in place of Contactor in a AMF System.
why 6.6,11,22,33,66kv? what basis they have considered?
Write a note on Treatment for electric shock.
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 33v to 430.v.
Explain what is clipper and clamper circuits?
Can i use the B-curve MCB instead of C-curve MCB
Hod do u calculate cable size for underground laying and the factors effecting/influencing it??
Why the transmision line are 11,33,63,132kv?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)