can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
No Answer is Posted For this Question
Be the First to Post Answer
explain why direct on line starting toque and current may not be acceptable
What are the special criteria under which FD fans are switched off during MFT.
why seal air fan is used and where it is used and where is suction taken from
what is the difference between kg/cm2 to MMWC
how mony power plants in India
What is indipendant power plant
what does mean by kva rating
What happens if there is no HP and LP By-pass.
can dp type level transmitter work in under vaccum condition
thermal power plants in steam using inlet of turbine.inlet of turbine pressure and flow is same as boiler feedpump why not use direct to turbine?
what is water consumption rate of water to condense one ton steam in condensor.
transformer shut down process.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)