Q 1) 1 Mason and 2 LABOUR / _________CUM brick work
Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work
Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work
Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
No Answer is Posted For this Question
Be the First to Post Answer
What is the meaning of M50,20? What is 50,what is 20
What is Well Point System in Dewatering
how to calculate MR 9(derivation)
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
"Gates of the dams are generally designed of curved shape". Why?
what are all the new civil construction materials?what are the new concepts ?
how to calculate weight of 1.8 cum of aggregate
07. 4 main points about check list for rebar works are– ––
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
what is the detention period for oxidation ponds
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
What is the roll of face bars in beams
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)