how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
No Answer is Posted For this Question
Be the First to Post Answer
rate analysis for cement pointing 1:4 , for 100 sq m
what is the wight of 4"/6" solid block?
What is geographic meridian?
how to absorb to site basic corrections? which are the important correction?
what is scour depth $ what's the process to determine it?
What is ld in beams column and slab.
what is perfect ballast for supporting the rails
what do you mean by ssd how it calculated
what is minimum steel area required for rcc slab
Can we apply curing compound on ceiling (slab Bottom)
What are the advantages of cad software?
how much quantity of bending wire required for 1sqmts
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)