how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
No Answer is Posted For this Question
Be the First to Post Answer
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
What are the ingredients of pre-stressed concrete?
Why reinforcement done in shorter span in two way slabs
0 Answers Osmani Constructions,
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP
What is the thumb rule for calculating the number of chairs in slab?
How many cncrete grades are used for construction,explain with proportion,grades and where it used
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is tacheometry?
how many types of foundation
how material can be calculate for brick work in 1:6
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,