How to find the requirement of cement and sand for the 1cum of rr masonry work
Answer Posted / s k majumder
First one have to choice grade of Concrete. Say M15 grade for which proportion is 1 : 2:4. total 7
N Now dry volume will be of 1 cum concrete is 1*1.52=1.52 cum
Hence
cement= 1.52/7 = 0.217cum = 7.66cft = 6.12 bag say 6 bag
sand (1,52/7)*2 = 0.434 cum= =15.33cft
Aggregate(=1.52/7)*4 =0.868cum= =30.66cft
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is meant by autocad?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
What is the difference between chamfer and fillet?
What are the responsibilities of a construction manager?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
What do you meant by gui?
What is the strength of cement?
how to caliculate required amount of cement and sand required for 1cu.m.
Define What is unit weight of normal concrete?
What is the use of mirror command?
What is the likely strength of a 1:2:4 concrete mix?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is difference between code and standard and specification?