In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer Posted / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Explain what is Critical Path Method (C.P.M)?
what radial pressure, the NP2 class rcc pipe can sustain?
what is flashing?
how we calculate the grade of the Bituminous materials.?????
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What do you mean by tolerance factor of concrete ?
Explain major difference between auto level and dumpy level?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
how to preaper for interview wat they asked in interview give me idea
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
Please let me know what is the simplest way of Calculating Mix Designs
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How can we convert weight batch to volume batch for m30 mix
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete